Question: the wires coming into the main service panel from Edison are too short for any replacement panel I can find. the wires are 9 inches and new terminal/lug location requires at least 15 inches to accommodate. will Edison replace those wires or am I responsible as the contractor?
This is a very common and frustrating situation. Here's the breakdown of who is likely responsible and what your options are
Likely Responsibilities (General Guidelines - Consult Local Codes and Edison):
Edison's Responsibility (Usually)
The service drop (the wires coming from the pole or underground transformer to your house) and the service entrance conductors
up to the point of connection at the meter. In many cases, they are also responsible for the conductors between the meter and the service panel. This varies widely by location and utility policy. Your Responsibility (or the homeowner's)
The service panel itself, and anything downstream of the service panel's main lugs/terminals.
In your case, with the wires too short for a new panel, the situation gets trickier. Here's why
Upgrading the Service
Generally, the utility company is NOT responsible for upgrading the service entrance conductors to accommodate a larger service panel (higher amperage) or different lug positions required by a new panel that you are installing. This is often viewed as an upgrade initiated by the homeowner, not a failure of the utility's equipment.
What to Do
Contact Edison (Your Utility) IMMEDIATELY
This is the most important step.
Explain the Situation Clearly
Tell them you are replacing the service panel and the existing service entrance conductors from the meter base to the panel are too short to safely connect to the new panel's lugs. Mention the specific distance discrepancy (9" vs. 15").
Ask Who is Responsible
Directly ask them who is responsible for extending or replacing those conductors.
Inquire About Options
Ask them about your options. They might: Replace the conductors themselves. Allow you or a licensed electrician to replace the conductors, after they disconnect and reconnect the service. Require you to hire an electrician that they have approved to replace the conductors.
Get it in Writing
If possible, get the utility's response and any instructions in writing (email is fine). This will protect you if there is any confusion later.2.
Review Local Codes and Edison's Service Requirements
Your local electrical codes and Edison's service requirements may have specific regulations regarding service entrance conductor lengths and allowable methods of extension. Your electrical inspector will have the final say.3.
Consider the Reason for Replacement
If the panel is being replaced due to a fault, fire, or other hazard caused by Edison's equipment, they might be more inclined to replace the conductors.4.
Alternative Solutions (If Edison Won't Replace)
Enlarging the Meter Box
Sometimes a larger meter box is an option. With a larger meter box, the meter placement is moved further from the panel, which results in more length on the service entrance conductors. This would require Edison to de-energize the service, and require you to coordinate with the utility.
Wire Extension (with Approved Methods)
Important: This is highly regulated and may not be permitted. If allowed, you might be able to extend the wires using: Listed and Approved Splice Kits
Special splice kits designed for underground service entrance (USE) conductors are sometimes allowed, but they MUST be specifically rated for the application and properly installed.
Junction Box (Pull Box)
A junction box can be installed to create a place to extend the conductors, but it needs to be accessible, of the correct size, and properly grounded. The junction box must be listed and rated for this application.
Meter Base Relocation
In extreme cases, moving the meter base closer to the panel might be considered, but this is a significant undertaking and requires Edison's approval and involvement.
Important Considerations
Safety
Working on or near service entrance conductors is extremely dangerous. Only qualified electricians should handle this work.
Never attempt to do it yourself! Permits
You will almost certainly need an electrical permit for this work.
Inspection
The work will need to be inspected by a local electrical inspector.
Coordination
Proper coordination with Edison is crucial to avoid power outages and ensure that the work meets their requirements.
In Summary:
While Edison may* be responsible, it's more likely that you will need to find a solution that either involves extending the existing conductors (if permitted and properly done) or having Edison de-energize and re-energize the service while a qualified electrician replaces the conductors from the meter to the new service panel. Start by contacting Edison immediately and carefully follow their instructions. Good luck! Flag for review