User: Alwayslearningelec, Location: NJ
Asked on: Tuesday, October 21, 2025 at 12:59 am EDT
Answered on: Tuesday, October 21, 2025 at 12:59 am EDT
Question: What is load shedding and would it apply to this situation? I believe I have heard it before and it means obviously shedding/reducing loads I guess We have a large 3000a piece of gear that needs temping out. The GC responding by saying .....temping out this gear will be an important discussion as there may not be a lot of load shedding and there are only two spare 200 amp switches in the adjacent gear.Okay I understand what he's saying by only having to spare 200 amp switches... he means that we don't have enough power to Temp out the gear. What does he mean by load shedding and how does that come into play in temping out the gear.If there is not enough available power to temp out the gear I guess the only other option is a generator?
You've got the right idea! Let's break down "load shedding" and how it applies to your situation
What is Load Shedding?
Load shedding, in this context, means deliberately reducing the electrical demand on a system by temporarily disconnecting or reducing power to non-critical loads. It's a way to prevent the system from being overloaded, which could lead to a complete shutdown or damage to equipment. Think of it like this: Analogy
Imagine a water pump trying to fill too many containers at once. To prevent the pump from burning out, you temporarily stop filling some of the less important containers (load shedding) so the pump can handle the rest.In a typical building or industrial setting, load shedding can involve: Turning off non-essential lights Reducing HVAC (heating, ventilation, and air conditioning) usage Postponing the operation of large equipment Temporarily disabling certain processes
How Load Shedding Relates to Temping Out Gear"Temping out" (temporarily powering down) a large 3000A piece of equipment for maintenance or testing requires a significant amount of electrical power, even though you're temporarily powering it down. Here's how load shedding comes into play:1. Power Demand
Temping out the equipment might still require power for various reasons; auxiliary systems, cooling systems, testing equipment etc.2.
Limited Capacity
The GC is saying they might have limited spare capacity to supply this power. They only have two spare 200A breakers available.3.
Load Shedding as a Solution (Potentially)
If the building or facility doesn't have enough spare capacity to accommodate the additional load needed, load shedding might be necessary. They would need to identify other circuits they can temporarily reduce or shut down to free up enough power to safely temp out the 3000A gear.
Why Load Shedding is a Discussion
The GC is signaling that load shedding might be complex and potentially disruptive. It's not simply flipping a switch. Here's why:
Impact on Operations
Load shedding can disrupt normal operations. They need to carefully assess which circuits can be safely reduced or shut down without causing major problems.
Coordination
Load shedding requires careful coordination. You need to know the impact on different systems and processes, and communicate with relevant stakeholders.
Safety
Load shedding needs to be done safely. You need to ensure that shutting down certain circuits doesn't create any safety hazards.
Alternatives to Load Shedding
You are correct! If there isn't enough power available even with load shedding, other options include:
Generator
A portable or temporary generator can be brought in to provide the necessary power for temping out the equipment. This isolates the load from the building's main electrical system.
Phased Approach
If possible, the temping out process could be broken down into smaller steps, each requiring less power, so that it can be accommodated within the existing capacity. This may or may not be feasible depending on the equipment.*
Upgrading Infrastructure
While not an immediate solution, the situation might highlight the need to upgrade the building's electrical infrastructure to provide more capacity in the future.
In summary:
The GC is preparing you for the possibility that temping out the 3000A gear will be complicated. They need to assess the available power, consider load shedding as a potential solution, and weigh the pros and cons of different approaches. You should expect a detailed discussion about the process, potential disruptions, and alternative solutions. Flag for review