Question: I received a service determination from Con-Edison, they give me the inrush current and infrequent ampsWhat is the difference between frequent inrush current and infrequent current? see below
Okay, let's break down the difference between inrush current and infrequent amps in the context of a Con Edison service determination. It's important to remember that I'm making assumptions based on common electrical engineering practices and Con Edison's likely concerns. You should always consult with a qualified electrician or electrical engineer to properly size your service.
Key Concepts Inrush Current (or Starting Current)
This is a high, momentary current that occurs when certain electrical equipment, like motors and transformers, are initially energized. It's significantly higher than the normal operating current. Think of it like pushing a heavy object from a standstill – it takes a lot more force to get it moving than to keep it moving.
Running Current (or Steady-State Current)
This is the current the equipment draws once it's up and running at its normal operating speed and temperature.
Infrequent Amps (or Intermittent Load)
This represents loads that are not continuous, are used periodically, and/or for short durations. This refers to the "running current" (or steady-state current) of the equipment when its running during that period.
The Difference - From Con Edison's Perspective
Con Edison is concerned with ensuring its electrical grid can reliably handle the loads you're placing on it at all times. The inrush current and infrequent amps are both important in this evaluation, but they address different concerns: Inrush Current
Duration
Very short (milliseconds to a few seconds).
Frequency
Can be considered "frequent" if equipment like elevators start and stop regularly, or "infrequent" if a large motor only starts occasionally.
Con Edison's Concern
A large inrush current can cause a momentary voltage drop on the grid. If enough customers have simultaneous inrush events, it can lead to larger voltage dips, potentially impacting other customers or even tripping protective devices. They need to ensure their system can handle these voltage dips without causing problems.
Impact on Service Sizing
They use the inrush current to determine if their transformers and conductors are sized appropriately to avoid excessive voltage drops or damage during starting.
Example
An elevator motor, a large HVAC compressor, or a bank of fluorescent lights all energizing at the same time.
Infrequent Amps (Intermittent Load)
Duration
Longer than inrush (seconds to minutes or even hours), but not continuous.
Frequency
By definition, infrequent. Used periodically
Con Edison's Concern
While not constant, these loads contribute to the overall demand on the system. They need to ensure the service capacity is sufficient to handle these intermittent loads in addition to the continuous loads, especially during peak demand periods.
Impact on Service Sizing
Considered when determining the overall service capacity required. They need to ensure that even when these infrequent loads are running, the system won't be overloaded.
Example
A welder used occasionally, a large electric oven used for a few hours a day, a battery charger that cycles on and off, or a large backup generator that's tested weekly.
Why the Distinction Matters to Con Edison System Stability
Con Edison needs to maintain a stable voltage and frequency on its grid. Inrush currents and intermittent loads, if not properly accounted for, can disrupt this stability.
Reliability
They need to ensure their equipment (transformers, cables, etc.) is not overloaded or stressed beyond its limits, which could lead to failures.
Planning
Understanding the types of loads helps them plan for future grid upgrades and expansions.
Example
Imagine a small manufacturing facility: Inrush Current
A large milling machine has a very high inrush current when it starts. Con Edison needs to know this to ensure the starting current doesn't cause problems for other customers on the same transformer.
Infrequent Amps
The same milling machine, when it's actually cutting metal, draws a significant amount of current, but it only runs for a few hours a day. Con Edison needs to account for this "infrequent load" when sizing the overall service to the building.
In Summary
Inrush current is a short-duration, high-amplitude current spike that happens when equipment starts. Infrequent amps are the current drawn by equipment when it's running during periods of usage. Con Edison needs to know both to ensure the reliability and stability of the grid and to properly size your service.
Next Steps
Consult an Electrician/Engineer
Have a qualified professional review the Con Edison determination and the specifications of your equipment. They can accurately calculate the loads and ensure your service is properly sized.2.
Review Con Edison's Requirements
Carefully read all the documentation from Con Edison. They may have specific guidelines or requirements for calculating inrush current and infrequent loads.
Disclaimer: I am an AI Chatbot and not an electrical engineer. This information is for general understanding and should not be substituted for professional advice. Always consult with qualified professionals for your specific situation. Flag for review