User: bmaclaff, Location: TN
Asked on: Sunday, October 26, 2025 at 9:27 am EDT
Answered on: Sunday, October 26, 2025 at 9:27 am EDT
Question: My work has been all resi NM to date and I'm starting to do some EMT work. I recognize the install learning curve is on me. My question is about pricing. I've seen info on this form and others quoting labor at 4-8 hours per 100ft of 3/4 EMT installed, pulling 3-10AWG stranded 2-6 hours per 100ft, with the range covering degree of difficulty, number of boxes, etc.My next job is in the 50x60 garage of a barndo, 32ft center height. I'll be installing high bay lights and general use 20A receptacles around the perimeter. Are folks pricing generally per foot EMT, per foot wire pulling? and how much?
Okay, transitioning from residential NM to EMT in a barndo garage is a good step up! Here's a breakdown of pricing strategies and factors to consider for your situation, along with considerations specific to a barndo garage
Pricing Philosophy: "Time + Materials + Overhead + Profit"
The core of any electrical pricing is understanding your costs and adding a reasonable profit margin. Don't just guess; track your time on similar tasks to refine your pricing.
Breakdown of Costs for EMT Work1. Materials
EMT Conduit
3/4" EMT price per foot (check local suppliers). Factor in couplings, connectors, straps, set screw vs compression fittings.
Wire
10 AWG THHN stranded (price per foot per color).
Boxes
4" square boxes, covers, mud rings, etc.
Receptacles
20A receptacles, plates. Consider whether they are standard or heavy duty, single or duplex, etc.
High Bay Lights
Cost per fixture (including any mounting hardware).
Fasteners
Screws, anchors, etc.
Grounding
Grounding wire, connectors, grounding bushings.
Consumables
Drill bits, cutting oil, tape, wire lube, etc.
Optional
Pull string/rope for wire pulling.
Optional
Concrete anchors, Unistrut, straps, screws2.
Labor
(This is the most variable part, and where your experience will improve your accuracy)
Conduit Installation
Cutting & Bending
Time to cut, ream, and bend EMT to fit your layout. 32ft center height requires a lift of some sort.
Mounting
Time to secure conduit to the structure.
Assembly
Time to connect sections with couplings and connectors.
Box Installation
Mounting
Time to mount boxes to the structure.
Connecting Conduit
Time to connect conduit to boxes.
Wire Pulling
Pulling Wire
Time to pull wire through the conduit runs. Consider the length of the runs and the number of bends.
Terminating
Time to connect wire to receptacles and lights.
Fixture Installation
Mounting
Time to mount high bay lights. This includes connecting the wiring.
Grounding
Grounding Conductor Installation
Time to run and connect the grounding conductor.
Cleanup
Time to clean up the work area.
Layout and Planning
Don't forget to allocate time for planning the layout and conduit runs.3.
Overhead
Vehicle Expenses
Gas, maintenance, insurance.
Insurance
Liability, worker's compensation (if applicable).
Tools
Amortization of tool costs (benders, cutters, threaders, etc.)
Office Expenses
Phone, internet, software, etc.
Licenses & Permits
Cost of permits and licenses.4.
Profit
A percentage on top of your total cost to ensure your business is sustainable. 10-20% is common.
Pricing Methods - and Recommendations for You Per Foot Pricing (EMT & Wire)
This is common, but you
MUST factor in difficulty. It's a good starting point, especially when you're building experience. EMT
Determine a per-foot price that covers materials (conduit, connectors, straps), labor (cutting, bending, mounting), and a portion of your overhead and profit. Start with the $4-8 range you mentioned, and adjust based on the specifics of the job (height, number of bends, mounting surface).
The height is a HUGE factor here. Wire
Determine a per-foot price for wire pulling that covers the wire itself, labor (pulling, terminating), and overhead/profit. Use the 2-6 hour range per 100ft as a starting point.
Time & Materials
Track your time meticulously. Bill your hourly rate plus the cost of materials. This is a good option if you're unsure about the job's complexity. Be TRANSPARENT with the customer. Give them an estimate of hours, but explain that it's subject to change.
Lump Sum
This is the riskiest for you, especially when you're new to EMT. You need to be very accurate with your estimate. It's generally best to avoid this until you have more experience.
Hybrid
A combination of methods. For example, you might price the EMT installation per foot, and the high bay light installation as a fixed price per fixture.
Specific Considerations for the Barndo Garage Height
32ft center height is a HUGE factor. You
WILL need a lift of some sort. This adds to your costs (rental, transportation, operation). Factor this into your labor and overhead. Mounting Surface
Is it steel frame, wood frame, or something else? This will affect your mounting methods and labor.
Access
Is it easy to get materials and equipment into the garage?
Barndo Construction
Barndos can sometimes have unique structural elements that make running conduit challenging. Be aware of potential obstructions.
Customer Expectations
Discuss the scope of work in detail with the customer. Make sure they understand what is included in your price.
Steps to Take Before Pricing1. Site Visit
Absolutely essential. Assess the conditions, take measurements, and identify any potential challenges. Talk to the customer about their expectations.2.
Plan Your Layout
Sketch out the proposed conduit runs and box locations. This will help you estimate the amount of material needed.3.
Get Material Prices
Contact your local suppliers for current pricing on conduit, wire, boxes, and fixtures.4.
Estimate Labor Hours
Break down the job into individual tasks and estimate the time required for each. Be realistic and add a buffer for unexpected problems.5.
Calculate Overhead
Determine your hourly overhead rate.6.
Add Profit
Apply your desired profit margin to the total cost.7.
Present Your Quote
Provide the customer with a detailed quote that outlines the scope of work, materials, labor, and total price. Be clear about any assumptions or exclusions.
Example (Simplified - for illustration only)
Let's say you estimate: 100ft of 3/4" EMT 300ft of 10 AWG wire 10 boxes 6 high bay lights Lift Rental for 3 days: $500Material Costs: EMT: $2.00/ft = $200 Wire: $0.50/ft = $150 Boxes: $5.00/box = $50 Lights: $200/light = $1200 Other Materials (connectors, straps, etc.) = $100
Total Materials = $1700
Labor Estimate: EMT Install: 16 hours Wire Pulling: 8 hours Box Installation: 4 hours Light Installation: 6 hours Other Labor (planning, cleanup): 4 hours Total Labor = 38 hours
Labor Rate: $75/hour Total Labor Cost = $2850
Overhead: Let's say your overhead rate is $25/hour Overhead Cost = $950
Lift Rental: $500Total Cost: Materials: $1700 Labor: $2850 Overhead: $950 Lift: $500 Total Cost = $6000
Profit (15%): Profit = $900Total Job Price: $6900
This breaks down to: EMT Price per Foot: $200/100ft = $2.00/foot for materials. Your labor rate covers the install. So in this scenario, you might quote $8/foot installed for the 3/4 EMT. Wire pulling: similar logic. $150/300ft = $0.50/foot for materials. Your labor rate covers the install. In this scenario, you might quote $2/foot for pulling and terminating 3-10AWG THHN.
Key Takeaways
Don't Underestimate the Height
It dramatically impacts labor and equipment costs.
Track Your Time
The more you track your time on EMT jobs, the more accurate your estimates will become.
Get Multiple Quotes
Shop around for the best prices on materials.
Be Transparent with the Customer
Explain your pricing and be willing to answer their questions.
Start Small
If possible, start with a smaller EMT job to gain experience before tackling a large project like this.
Safety First: Always prioritize safety when working with electricity and at heights.Good luck! This is a great opportunity to expand your skills and grow your business. Remember to be thorough, communicate clearly with the customer, and learn from each job. Flag for review