Question: Ok, I have a hood that has a number of equipment that is 208V which we are sending to its own panel for the shunt trip. Here comes the BUT, the Kitchen Designer also placed a couple pieces of equipment that are 480V under same hood, and he cannot get that type of equipment in lower voltage.How should I shunt trip the 480V along with the 208V with (1) push button to shut everything down?
Okay, this is a common situation in commercial kitchens and requires careful planning to ensure safety and code compliance. Here's a breakdown of how to handle this mixed voltage shunt trip scenario
Understanding the Problem
Mixed Voltages
You have 208V and 480V equipment under the same hood.
Shunt Trip Requirement
The hood system requires a shunt trip, meaning you need to be able to de-energize all equipment under the hood with a single push button in case of a fire or other emergency.
Single Push Button
The key requirement is using a single push button to initiate the shunt trip for both voltage systems.
Code Compliance
Everything must meet applicable electrical codes (NEC), building codes, and fire codes.
Solutions and Considerations
Here's the recommended approach, combining multiple elements for a robust and compliant system:1. Separate Panels
208V Panel
Keep your existing 208V panel dedicated to the 208V equipment under the hood. This panel will have its own main circuit breaker with a shunt trip attachment.
480V Panel
Install a separate 480V panel dedicated solely to the 480V equipment under the hood. This panel must also have a main circuit breaker equipped with a shunt trip attachment.Reasoning: Separation ensures overcurrent protection is correctly sized for each voltage system and simplifies the shunt trip wiring.2.
Shunt Trip Relay System (Recommended) Shunt Trip Relays
Install two shunt trip relays. One for the 208V panel and one for the 480V panel. These relays are low-voltage devices (typically 24V DC or 120V AC) that, when energized, release the shunt trip mechanisms on the respective main circuit breakers.
Control Relay
Install a control relay. This relay will be energized when the emergency stop push button is not pressed. When the button is pressed, the control relay de-energizes, sending a signal to de-energize the shunt trip relays.
Power Supply
A low-voltage power supply (e.g., 24V DC or 120V AC) will be needed to power the shunt trip relays and the control relay.
Wiring
Wire the emergency stop push button to the coil of the control relay. Wire the normally open contacts of the control relay in series to the coils of the shunt trip relays.How it works: When the emergency stop push button is pressed, it opens the circuit to the control relay, which de-energizes. This causes the control relay's contacts to open, which de-energizes the shunt trip relays. When the shunt trip relays are de-energized, they send a signal to trip the main circuit breakers in both the 208V and 480V panels, shutting off power to all equipment under the hood.Diagram
3. [Emergency Stop Push Button] --(Normally Closed Contacts)---> [Control Relay Coil]|| Power Supply (+)|[Control Relay Normally Open Contacts] -- Series --> [208V Shunt Trip Relay Coil] -- Series --> [480V Shunt Trip Relay Coil] --> Power Supply (-)[208V Shunt Trip Relay Contacts] --> [208V Panel Main Breaker Shunt Trip][480V Shunt Trip Relay Contacts] --> [480V Panel Main Breaker Shunt Trip]
Single Point of Activation
Emergency Stop Push Button
Install a prominently labeled, easily accessible emergency stop push button near the hood. This button should be a mushroom-head type, red in color, and clearly marked "EMERGENCY STOP" or similar. It must be a maintained contact type (meaning it stays in the "off" position until manually reset).4.
Interlock with Fire Suppression System (Critical)
Fire Suppression System Integration
This is essential. The fire suppression system (e.g., ANSUL) must automatically activate the shunt trip system when it discharges. This is typically done by using a switch or relay within the fire suppression system control panel that closes (or opens, depending on the system design) when the system discharges. This switch is wired in parallel to the emergency stop push button.
Reasoning
In the event of a fire, the fire suppression system should automatically cut power to the equipment under the hood, even if someone doesn't manually press the emergency stop button.5.
Testing and Commissioning
Thorough Testing
After installation, rigorously test the shunt trip system. Verify that pressing the emergency stop button and activation of the fire suppression system both reliably de-energize all equipment under the hood. Document the testing process.
Periodic Testing
Implement a regular schedule for testing the shunt trip system (e.g., monthly or quarterly) to ensure it remains functional.
Important Considerations and Code Compliance
NEC Compliance
Ensure that all wiring, overcurrent protection, and grounding comply with the National Electrical Code (NEC). Pay particular attention to Article 680 (Swimming Pools, Fountains, and Similar Installations) if you have water features or cleaning systems under the hood, even if they aren't directly related to cooking.
Local Codes
Check with your local building department and fire marshal for any specific requirements or amendments to the NEC that may apply in your jurisdiction. They may have specific regulations for commercial kitchen shunt trip systems.
Equipment Listing
Ensure that all equipment (panels, breakers, shunt trip attachments, relays, power supplies) are UL-listed or otherwise approved for their intended use.
Wiring Methods
Use appropriate wiring methods (e.g., EMT conduit, MC cable) and wiring types rated for the environment (e.g., high temperature, moisture).
Emergency Lighting
Ensure adequate emergency lighting is provided in the kitchen area to allow safe egress in the event of a power outage.
Documentation
Keep detailed documentation of the shunt trip system design, wiring diagrams, equipment specifications, and testing records. This will be helpful for future maintenance and troubleshooting.
Example Component Selection (Illustrative - Consult with an Engineer) Shunt Trip Relays
A 24V DC or 120V AC relay with a coil voltage that matches your chosen power supply, and contacts rated to switch the current required by the shunt trip coils of the main circuit breakers.
Power Supply
A 24V DC or 120V AC power supply with sufficient capacity to power both shunt trip relays and the control relay.
Emergency Stop Button
A NEMA 4X rated maintained contact push button.
Control Relay
24V DC or 120V AC with contacts able to handle the current of the shunt trip relay coils.
Why this solution is preferred
Safety
It provides a reliable and redundant way to de-energize all equipment under the hood in an emergency.
Code Compliance
It meets the requirements of the NEC and other applicable codes.
Flexibility
It can be easily adapted to different voltage systems and equipment configurations.
Maintainability
The components are readily available and easy to replace.*
Testability
The system can be easily tested to verify its functionality.
Professional Consultation
This is a critical safety system.
Do not attempt to design or install this system without consulting with a qualified electrical engineer or licensed electrician experienced in commercial kitchen systems. They can perform a load calculation, select the appropriate equipment, and ensure that the system is installed correctly and meets all applicable codes.By following these guidelines and working with qualified professionals, you can create a safe and compliant shunt trip system for your commercial kitchen hood. Good luck! Flag for review