Question: A Customer is dead set on buying a generator that comes with a 200 transfer switch. His service is 100 amps. I tried to see if they sell 100 breakers so I could just swap the breakers. But I believe the breakers are physically different.It’s an older service with the service disconnect/main breaker inside in the panel. What I propose is to just add a simple 100 amp service disconnect outside between meter and new 200 amp transfer switch. Separate the grounds in the neutrals inside. And run the grounding electrodes into the service disconnect outside. Am i missing something? I think this is a simple solution, that way he can buy and use what he wants. And he will have a big generator on a little house

Okay, let's break down the situation and your proposed solution. You're dealing with a customer who wants a specific generator setup (with a 200A transfer switch) on a 100A service. You're trying to find a safe and compliant way to accommodate this request while adhering to electrical codes.Here's a breakdown of your proposed solution, potential issues, and some alternatives

Understanding the Problem
Mismatched Ampacity

The core issue is the significant difference between the 100A service and the 200A transfer switch. While the generator might be capable of supplying more power, the service entrance conductors, panel, and existing wiring are only rated for 100A. Overloading this system is a fire hazard.


Breaker Compatibility

You are correct that 200A breakers are physically larger and designed for a different panel than 100A breakers. A direct swap is not feasible.

NEC Concerns

The National Electrical Code (NEC) is very specific about how transfer switches are installed and rated in relation to the service entrance.

Your Proposed Solution: Adding an External 100A Service Disconnect
Placement

Installing a 100A service disconnect between the meter and the existing 100A panel is the right approach.

Separating Neutrals and Grounds

This is correct
only in the main panel or service disconnect (only one location).

Grounding Electrode System (GES)

This is also correct, the GES needs to be landed in the 100A service disconnect.

Here's a step-by-step breakdown of what needs to be done to install the generator transfer switch


Install the 100 amp outdoor service disconnect
This requires disconnecting power to the home, pulling the meter, installing a service rated disconnect rated for 100 amps.2. Connect Grounding System

Install the ground rods from the existing electrical system into the new service disconnect. This grounding system will be solely used for the generator system.3.

Wiring Between Disconnect and Transfer Switch

Connect the load side of the 100A service disconnect to the 'Utility' side of the 200A transfer switch using conductors rated to handle 100A. Connect the neutral and ground conductors appropriately, ensuring proper separation as described above.4.

Connect Generator Input

Wire the generator input to the transfer switch.5.

Wiring From Transfer Switch to Existing Panel

Connect the 'Load' side of the 200A transfer switch to the existing 100A main breaker panel using conductors rated for 100A. Connect the neutral and ground conductors appropriately.

Advantages of this approach



Compliance

With proper execution, this method can comply with NEC requirements regarding service disconnects and transfer switch installations.


Customer Satisfaction

It allows the customer to purchase the preferred generator/transfer switch combination.

Potential Issues and Considerations



Service Entrance Conductor Ampacity

Ensure the existing service entrance conductors from the meter to the original 100A panel are adequate for the 100A service. If they are undersized, they
must be upgraded.

Panel Labeling

Clearly label the new service disconnect as the "Generator Service Disconnect" and the existing panel as the "Main Load Panel".

Over-Fusing Concerns

While the transfer switch is rated for 200A, the system is still limited to 100A by the service disconnect and the panel.

The 200A rating of the transfer switch is NOT an authorization to exceed the 100A service capacity.
Educate the customer about this limitation. If the generator is a big one and the customer is loading the house up, the 100 amp breaker will trip in the service disconnect before any damage can occur to the electrical system. This must be explained to the customer. Future Expansion

The customer may envision a future service upgrade. If so, factor that into the initial installation. Consider using conduit runs large enough to accommodate larger conductors in the future.

Permits and Inspections

Obtain all necessary permits and inspections. Electrical work like this requires professional oversight.

Important Considerations and Alternatives
Upgrading the Service

The best solution, if feasible and within budget, would be to upgrade the entire service to 200A. This would require: New service entrance conductors from the utility. A new 200A service panel. Upgrading any undersized branch circuit wiring. New grounding electrode system, if necessary. This is the safest and most future-proof option, but it's also the most expensive.

Load Calculation

Perform a thorough load calculation on the customer's home to determine the actual demand. It might be possible that even with the generator, the load will not exceed 100A, making the existing service adequate. However, proceed with caution and clear communication with the customer.

Alternative Transfer Switches

Explore other transfer switch options. There might be 100A or 150A transfer switches available that are more appropriately sized for the service. However, the customer seems set on the 200A unit.

Code References (Illustrative Examples - Consult the NEC for Specifics)



NEC 230

Service Entrance Requirements

NEC 250

Grounding and Bonding


NEC 702

Optional Standby Systems (Generators)

NEC 408

Switchboards and Panelboards

Recommendations
1. Thorough Load Calculation

Start with a detailed load calculation.2.

Communicate with the Customer

Explain the limitations of the 100A service. Make it clear that the 200A transfer switch does
not* increase the available power.3.

Prioritize Safety

Emphasize that exceeding the service rating can cause fires and equipment damage.4.

Professional Installation

Stress the importance of a qualified electrician performing the work.5.

Document Everything:
Keep detailed records of the installation, including load calculations, wiring diagrams, and inspection reports.By following these steps, you can help your customer achieve their desired generator setup while ensuring safety and code compliance. Remember to always consult the latest edition of the NEC and local regulations. Flag for review

Previous Question Next Question