Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: how to run wires down through continuous LVL garage headers

User: Stevenfyeager, Location: United States, Indiana

Asked on: Thursday, October 30, 2025 at 7:47 am EDT
Answered on: Thursday, October 30, 2025 at 7:55 am EDT

Question: A local building code requires garages here to have an LVL header run across the overhead doors plus past the doors, many times running across the entire wall, one end to the wall to the other. For exterior lights or interior outlets, etc, how do you run wiring down from the ceiling ? Thank you

Okay, you're describing a common situation with LVL headers in garage construction. Here's how you can handle running wiring down from the ceiling for lights, outlets, and other electrical needs in that context, along with considerations for code compliance and best practices

Understanding the Challenge
LVL (Laminated Veneer Lumber) Headers

These are structural components, and you
cannot drill large holes through them without compromising their integrity. The building code may have specific limitations on the size and placement of holes that are allowed.

Fire-Rated Walls (Sometimes)

Garages are sometimes required to have fire-rated walls separating them from the living space. Penetrations through these walls need to be carefully sealed to maintain the fire rating.

Concealing Wiring

Ideally, you want to conceal the wiring for a clean and professional look.

Solutions and Methods
1. Routing Wiring Around the LVL Header



Above the Header

This is the most common and preferred method. Run the wiring above the LVL header in the ceiling cavity (between the ceiling drywall/sheathing and the joists/trusses). Then, bring the wire down the wall beside the header.

Below the Header

Run the wiring below the header, in the wall cavity between the studs below it. This might be necessary if you have limited space above the header.2.

Vertical Chases/Conduit



Along the Wall

Install a vertical electrical chase (often made of wood) or a surface-mounted conduit run along the wall. The wiring goes inside the chase or conduit from the ceiling down to the outlet or light location. This is a good option if concealing the wiring within the wall is difficult or impossible. Metal conduit provides more physical protection for the wiring.3.

Drilling Small Holes (If Allowed by Code and Engineer)



Check Local Codes and Consult an Engineer

This is critical. Before even considering this option, check with your local building inspector and, if possible, consult with a structural engineer or the LVL manufacturer's specifications. They can tell you if small, strategically placed holes are permitted and the maximum allowable size.

Stay Within Allowed Zones

If drilling is allowed, it will likely be limited to very specific zones on the LVL header (e.g., near the neutral axis, away from edges, etc.).

Use Proper Drilling Techniques

Use sharp drill bits to create clean holes. Avoid forcing the drill.4.

Consider Flexible Metal Conduit (FMC) or Electrical Metallic Tubing (EMT)



Exposed Wiring

If you're okay with exposed wiring, you can use FMC or EMT to run the wiring from the ceiling to the desired location. Secure the conduit to the wall with appropriate straps. This option is often used in industrial or workshop settings.5.

Wiring to the Wall Studs

If possible run your wire inside the wall cavity of a stud, and not even touching the header. Then cut your box into the drywall at the location where the wire is.

Important Considerations and Best Practices
Code Compliance

This is paramount. All electrical work must comply with the National Electrical Code (NEC) and any local amendments. This includes proper wiring methods, box fill calculations, grounding, and GFCI protection (especially in garages).

Permits and Inspections

Obtain the necessary electrical permits and have your work inspected by a qualified electrical inspector.


Professional Electrician

If you're not experienced with electrical work, hire a licensed electrician. Electrical work can be dangerous, and improper wiring can cause fires or electrical shock.

Safety

Turn off the power at the breaker before working on any electrical circuits. Use insulated tools. Wear appropriate personal protective equipment (PPE), such as safety glasses and gloves.

Fire Stopping

If you penetrate a fire-rated wall, use a fire-rated sealant or firestop material to seal the penetration around the wiring or conduit.


Box Fill

Make sure the electrical boxes you use are sized appropriately for the number of wires and devices they contain. Overfilled boxes are a fire hazard.

Example Scenario


Let's say you want to install an outdoor light above the garage door. Here's a possible approach:1. Route

Run the wiring above the LVL header in the ceiling cavity.2.

Drop

Bring the wiring down the wall cavity beside the header.3.

Box

Install an electrical box for the light fixture at the desired location on the exterior wall.4.

Wiring

Connect the wiring to the light fixture, ensuring proper grounding and weatherproofing.

In summary:
Prioritize running the wiring around the LVL header. If drilling is unavoidable, get expert advice and follow code requirements meticulously. If in doubt, hire a qualified electrician. Flag for review

Previous Question Next Question