Question: If you has transformer located about 2-4' from panel it was feeding/being fed from would you run FMC into the panel if the xfmr was(as usual) utilizing FMC or would you transition over to EMT? Not sure if allowed by code.

Okay, let's break down the options and relevant NEC considerations for running conduit between a transformer and a panel located 2-4 feet apart, assuming both the transformer and panel are typically using Flexible Metal Conduit (FMC) connections.

Understanding the Situation Short Distance

2-4 feet is a very short run.


Transformer Connections

Transformers commonly use FMC for flexibility and vibration isolation.

Panel Connections

Panels can accept either FMC or EMT (or other conduit types).

Code Considerations (NEC - US National Electrical Code)
300.3(B) Single Raceway

Generally, all conductors of a circuit (hot, neutral, ground) must be installed in the same raceway or cable. This is for inductive balance and to reduce impedance.

300.18(A) Complete Runs

Raceways shall be installed as a complete system before conductors are pulled in.


300.21 Prevention of Fire Spread

Raceways passing through fire-rated walls, floors, or ceilings must be properly fire-stopped. This isn't directly related to your question, but important to keep in mind in a real installation.

348 FMC (Flexible Metal Conduit)



348.12 Uses Not Permitted

FMC has limitations. Specifically, note these two:

(5) In wet locations unless the conductors are approved for the specific conditions and the installation is such that liquid is not likely to enter other raceways or enclosures to which the conduit is connected.
(8) Where subject to physical damage 348.20 Size

Minimum trade size is 1/2" unless otherwise permitted.


348.30 Securing and Supporting

FMC needs to be supported. Section 348.30 dictates support requirements (generally within 12 inches of termination and at intervals not exceeding 4 1/2 feet). However, 348.30(A) states that if FMC is no more than 3 ft long at a terminal, no supports are needed.

358 EMT (Electrical Metallic Tubing)



358.12 Uses Not Permitted

EMT has fewer restrictions than FMC.

358.30 Securing and Supporting

EMT also needs support, but the rules are slightly different. Typically, EMT requires support at intervals not exceeding 10 feet, and within 3 feet of termination, although there are exceptions for short runs.

Analysis and Recommendations


Given the short distance, both FMC and EMT are
likely code-compliant, but here's the breakdown:1. FMC for the Entire Run



Advantages

Simplest installation if the transformer already uses FMC. Provides continued flexibility.

Disadvantages

FMC might be considered less robust than EMT if physical damage is a concern. FMC is slightly more expensive than EMT.

Code Compliance

Probably compliant,

provided

The location is not wet or subject to physical damage. You meet the securing and supporting requirements of 348.30. Since it is a short run, no supports might be needed (Check local amendments). Proper connectors are used at both the transformer and panel (rated for the specific size and type of FMC).2.

EMT for the Entire Run



Advantages

More robust and resistant to physical damage. Potentially lower cost than FMC (depending on the specific situation).

Disadvantages

Requires more precise bending and fitting. Might be more difficult to install in tight spaces. Less flexible than FMC, which might be a concern for vibration.

Code Compliance

Likely compliant,

provided

Proper connectors are used at both the transformer and panel (rated for the specific size and type of EMT). EMT is properly supported per 358.30. For a short run, this will likely mean support within 3 ft of termination3.

Transition from FMC to EMT



Advantages

Provides flexibility at the transformer with FMC, and rigidity/protection with EMT for the main run.

Disadvantages

Requires a junction box or fitting to transition from FMC to EMT, adding cost and complexity. Must ensure the junction box is accessible.

Code Compliance

Can be compliant, but requires careful attention to detail. The junction box must be properly sized (volume calculations). All connections within the junction box must be made with approved methods. The junction box must be accessible. Grounding must be properly maintained across the transition.

Recommendation


In your specific scenario (2-4 feet, transformer already using FMC), I would generally recommend using FMC for the entire run, unless there's a specific reason to choose EMT (e.g., high risk of physical damage). Keep it simple

Using FMC simplifies the installation, especially if the transformer is already using it.


Cost-effective

Avoids the cost of a junction box and additional connectors.

Important Considerations



Local Amendments

Always check for local amendments to the NEC. Your local jurisdiction might have specific requirements or preferences.


Inspector

If you have any doubts, consult with your local electrical inspector. They have the final say on code compliance.

Voltage/Current

The voltage and current carried by the conductors will influence the required size of the conduit.


Conductor Fill

Ensure that the conduit fill is within the limits specified in the NEC (Chapter 9, Table 1).*

Grounding

Proper grounding is essential. Make sure that the grounding conductor is sized correctly and properly connected at both ends of the run.

Steps to Take


Assess the Environment

Is the area wet or prone to physical damage?2.

Determine Conductor Size and Number

This will determine the minimum conduit size.3.

Check Local Codes

Review any local amendments to the NEC.4.

Consult with an Inspector (If Needed)

Get clarification on any unclear points.5.

Select Appropriate Materials

Choose FMC or EMT, connectors, and grounding components.6.

Install Properly:
Follow all NEC requirements for installation.By carefully considering these factors, you can ensure a safe and code-compliant installation. Flag for review