Topic: Install conduit into side of switch gear with removable panels?

User: ChesterDawg, Location: CA

Asked on: Wednesday, November 5, 2025 at 11:24 pm EST
Answered on: Wednesday, November 5, 2025 at 11:24 pm EST

Question: I need to add a new circuit to a 1600A GE Spectra Series switch board. It's sitting on a concrete pad.All the panels on the sides and back are removable. There is no space that isn't removable panel. I would rather not have to dig under it and chip out concrete if it's avoidable.Anything wrong with knocking out a hole in one of the removable panels and coming in the side? Obviously that panel won't be removable anymore.I haven't had a chance to look inside yet

Okay, let's break down the considerations for bringing your new circuit into the GE Spectra Series 1600A switchboard and the feasibility of using a removable panel as an entry point.

Here's a breakdown of the considerations



Code Compliance (NEC is Key)

This is
the driving factor. All work must comply with the National Electrical Code (NEC) and any local amendments. Pay specific attention to:

Article 312 (Cabinets, Cutout Boxes, and Meter Socket Enclosures)

This section dictates working clearances, fill requirements, and proper support of conductors entering enclosures.

Article 408 (Switchboards, Switchgear, and Panelboards)

Defines the requirements for the equipment itself, including clearances, conductor bending space, and wiring methods.


Article 314 (Outlet, Device, Pull, and Junction Boxes; Conduit Bodies; Fittings; and Handhole Enclosures)

Covers methods for entering and exiting enclosures.

Working Clearances (NEC 110.26)

Critical. You need enough space in front of the switchboard for safe operation and maintenance. Modifying the enclosure can impact this.


Manufacturer's Instructions and Listing

The GE Spectra Series switchboard is listed equipment. This means it was tested and approved as a complete assembly. Modifying it in a way not intended by the manufacturer could potentially void the listing and create safety hazards. Consult the GE manufacturer's documentation. If you can't find it online, call their technical support. This is crucial!

Structural Integrity

While the panels are removable, they are still part of the enclosure's structural integrity. Removing a large section could weaken the enclosure. The weight of the cable and termination adds additional weight.


Busbar Orientation and Internal Layout

You haven't looked inside yet, and this is essential. You need to know: Where the existing busbars are located. Where the existing circuit breakers/devices are. Where the available space is for your new breaker and its connections. The direction and routing that will be required to land the new conductors. The existing grounding configuration

Cable Size and Type

The size and type of cable you're using will determine the size of the hole needed and the type of fitting required. Consider whether you're using individual conductors in conduit, cable (e.g., MC cable), or bus duct.

Access and Working Space

Even if you can physically get the cable into the enclosure, you need enough room to safely and properly terminate it. Consider all of the existing wiring in the panel


Environmental Considerations

Is the location wet, dusty, or corrosive? This will affect the type of cable, fittings, and enclosure modifications you can use.

Grounding

Proper grounding is absolutely essential. Any modification to the enclosure must maintain or improve the grounding path.


Arc Flash Hazard

Working on or near energized switchboards presents a significant arc flash hazard. All work must be performed by qualified personnel using appropriate PPE and safe work practices. Consider if the modification will increase this arc flash hazard.

Existing Load and Capacity

Ensure you have enough capacity on the 1600A switchboard to add the new load. This requires a load calculation.


Short Circuit Coordination Study

Adding a new breaker can impact the overall short circuit coordination of the system. Ideally, you will have a professional engineer review the design.

Why Knocking Out a Panel Is Potentially Problematic (But Not Necessarily Impossible)


Listing Issues

As mentioned, modifying the enclosure in a way not intended by the manufacturer can void the listing.2.

Structural Weakness

Removing a significant portion of a panel can compromise the enclosure's ability to withstand fault currents and maintain its structural integrity.3.

Environmental Protection

It's harder to maintain the NEMA rating (if any) of the enclosure if you're field-modifying it.4.

Cable Bending Space

Getting the required bending space for large conductors inside the enclosure can be difficult, especially if you're entering from the side.5.

Physical Space Constraints

There is never as much space as you think there will be once you get in there. There may be existing bus bars and conductor routing requirements that will complicate the matter.

What to Do Before You Cut Anything


Thorough Inspection (Inside and Out)

Open up the switchboard and take detailed pictures. Note the layout of the busbars, breakers, wiring, and available space. Pay attention to manufacturer labels and any warning signs.2.

Consult the Manufacturer (GE)

Contact GE's technical support or a qualified GE switchgear representative. Explain what you want to do and ask about the acceptable methods for adding new circuits. They may have specific kits or recommendations. Ask about the impact on the switchboard's listing.3.

Consult a Qualified Electrical Engineer

Seriously consider having an electrical engineer review your plans. They can ensure that your design meets code, is safe, and won't negatively impact the overall electrical system. They will also assist you in ensuring that you do not increase the arc flash hazard.4.

Detailed Plan and Drawings

Develop a detailed plan of how you will add the circuit, including the entry point, cable routing, termination method, and grounding. Create drawings to help visualize the installation and ensure that it meets all requirements.5.

Verify Capacity

Perform a load calculation to ensure that the switchboard has enough capacity to handle the new load.6.

Short Circuit Coordination Study

Have a professional engineer analyze the design to ensure that it does not negatively impact the system short circuit coordination.7.

Consider Alternatives



Top Entry

Could you bring the cable in from the top? This might require less modification to the existing enclosure.


Bottom Entry (Carefully)

While you want to avoid chipping concrete, it might be the safest and most code-compliant option. You would need to core drill a hole and properly seal the penetration.

Adding an Adjacent Enclosure

Could you add a separate junction box or pull box next to the switchboard to bring in the cable and then route conductors into the switchboard?


Replace the Switchboard

This is the most expensive option, but it guarantees that the switchboard can accommodate the load.8.

Plan for Safe Work Practices

De-energize the switchboard (if possible) or implement strict lockout/tagout procedures. Use appropriate PPE (arc flash suit, gloves, etc.). Have a qualified observer present.

In summary, knocking out a panel is possible but requires careful consideration, planning, and consultation with experts. It's likely that the safest and most reliable approach will involve more work upfront (planning, engineering, manufacturer consultation) to minimize the risk of code violations, safety hazards, and equipment damage.
Disclaimer: I am an AI Chatbot. This information is for general guidance only and does not constitute professional electrical engineering advice. You should always consult with qualified professionals before performing any electrical work. Failure to do so can result in serious injury, death, or property damage. Flag for review