Question: I have a dual lug meter which I would like to pass the first set of service wires through a short (<<24") 3" nipple to the first main panel.The second set of service wires, I would like to put through this same 3" nipple (NEC Fill is OK), then simply pass them through this first main panel box to another nipple exiting the back of the panel and feeding a second main disconnect.In short, can I use the area of the first main panel as a pass-through box for a second set of service wires.This would greatly clean up a new service where both main panels are in close proximity to the meter, one inside of a wall, the other on the outside of the wall.
Okay, let's break down the NEC considerations for your proposed setup.
The Key Concerns and Potential Violations
Work Space and Conductor Clearance
NEC 110.26(A)(1) and 110.26(A)(3) deals with the required work space and clear space around electrical equipment, including panels. Having service conductors passing through a panel that already has terminations (breakers, lugs, etc.) makes maintaining those clearances difficult, and could impede safe operation and maintenance. While you technically aren't terminating the second set of service conductors in the first panel, their presence does impact the available working space.2.
Panel Fill and Heat
Although you are not planning on using the panel to terminate any additional load-side wires, running those service conductors though the panel will add to the already existing heat that's created by the load-side circuits.3.
Neutral and Grounding
The NEC has very specific rules regarding the bonding of neutrals and grounds, particularly at the service entrance. Introducing a second set of service conductors through the first panel could unintentionally create a parallel neutral path, which is a significant safety hazard.4.
Accessibility and Identification
NEC requires that all components of the electrical system be accessible and clearly identified. Service conductors passing through an enclosure dedicated to another service could create confusion and make it harder to identify which conductors belong to which system.
Why it's Generally a Bad Idea, Even if Technically "Possible" in Some Narrow Interpretations
Increased Risk
Working inside the first panel becomes more hazardous because of the presence of the "pass-through" service conductors. Even if de-energized, they present a potential arc-flash hazard.
Inspector Scrutiny
Any electrical inspector is going to look very closely at this setup, and will very likely require you to find a different solution. They're going to be concerned about the safety and code compliance issues mentioned above.
Future Problems
Down the road, if someone needs to work on either panel, having the second set of service conductors passing through the first complicates everything.
Better Solutions
Use a Separate Junction Box
This is the recommended solution. Instead of passing the second set of service conductors through the first panel, install a properly sized junction box next to the meter and close to both panels. Bring both sets of service conductors into this junction box, and then run separate conduits to each main panel. This keeps the panels clean, accessible, and compliant. The junction box needs to be sized appropriately for the conductors, and all connections must be made with approved connectors (e.g., Polaris connectors).2.
Dual-Lug Meter Socket with Two Sets of Lugs Per Phase
Some meter sockets are specifically designed to accommodate two sets of service conductors per phase. If your meter socket has this capability (and is properly rated), you can run separate conduits directly from the meter socket to each main panel. This is generally the cleanest solution, but requires a suitable meter socket.3.
External Tap Box (Service Entrance Rated)
Mount a service-entrance rated tap box (sometimes called a splitter box or a distribution block) near the meter. Run the main service conductors into this tap box, and then run separate feeders from the tap box to each main panel. Again, this keeps the panels themselves clear and compliant.
Important Considerations
Local Codes and AHJ
Always check with your local electrical inspector (AHJ - Authority Having Jurisdiction) before starting any electrical work. They have the final say on what's acceptable in your area, and may have specific requirements or interpretations of the NEC.
Conductor Sizing and Protection
Make sure that all conductors are properly sized for the load they will carry, and that each main panel is protected by an appropriately sized overcurrent device (circuit breaker or fuse).
In summary, while it might* be technically permissible to run service conductors through the first panel, it's a very bad practice that will likely be rejected by an inspector. Using a separate junction box or a dual-lug meter socket is a much better, safer, and more code-compliant solution. Flag for review