Question: Working on a project where the Owner wants all of the boat dock power pedestals to have a 30Amp and 50Amp receptacle for each boat. Article 555 doesn't have a Demand Factors table like Recreational Vehicle Sites Table 551.73(A). Trying to figure out how many boat dock power pedestals I can put on the same 200Amp, 120/240 volt circuit. Comments please.............Thanks in advance.

You're right, Article 555, specifically covering Boat Docks, doesn't provide demand factors like those found for RV parks. This makes sizing the service for a marina or boat dock tricky, and a purely code-based approach often leads to significant over-sizing.Here's a breakdown of the considerations and how to approach this

1. The Problem: No Code-Based Demand Factors
Article 555.7(A)

Requires feeder and service-entrance conductors to have an ampacity not less than the sum of the loads calculated in accordance with 555.7(B) through (E).


555.7(B)

Requires at least one 20-ampere receptacle to be calculated for each boat slip, but for calculating the load for each slip that has more than one receptacle, you must calculate the load for the largest receptacle.

555.7(C)

requires a load of not less than 30 amperes for each 50-ampere receptacle provided for connection of boats with dwelling unit living space.


The Conservative Approach

Code generally directs you to assume full load for each receptacle. This would be a disaster in a marina setting. Imagine calculating 50 amps for every 50-amp receptacle; the service would be gigantic and hugely wasteful.

2. Alternatives to Code-Based Calculations (Engineering Judgement & Load Monitoring)


Since the code doesn't provide demand factors, you need to use engineering judgement and, ideally, load monitoring to make a more realistic assessment: Engineering Judgement

This is your best approach. Consider the type of boats that will likely be using the dock.


Small Boats

If the marina primarily caters to smaller boats (e.g., fishing boats, small cruisers), a 50-amp receptacle is likely oversized and will rarely be used to its full capacity.

Larger Boats

If the marina is for larger yachts, the 50-amp receptacles will be used more often and at higher loads.


Occupancy Patterns

Consider occupancy rates. Is the marina fully booked year-round, or is it mostly used on weekends?

Time of Day

Power usage varies throughout the day (peak demand in the evenings, lower overnight).


Load Monitoring (Highly Recommended)



Existing Marinas

If you have access to similar existing marinas, monitor their power consumption over time. This will give you real-world data on demand factors. Record the total amperage draw at different times of day and days of the week.


Temporary Monitoring

If possible, install temporary power monitors on a similar section of a marina to collect data before finalizing the design.

Diversity Factors (Based on Experience/Data)

Based on your load monitoring and/or experience, you can develop diversity factors. For example:
You might find that, on average, only 20-30% of the 50-amp receptacles are used simultaneously, and even those are not at full load. The 30-amp receptacles will likely have higher diversity, especially if many slips have both 30-amp and 50-amp.

Consider Future Expansion

Factor in potential future expansion of the marina when sizing the service.

3. Calculation Example (Hypothetical with Estimated Diversity)

Let's say you have 4 boat slips, each with a 30-amp and a 50-amp receptacle.

Conservative Code Approach

4 x 50A = 200A 4 x 30A = 120A Total = 320A. This would require a much larger service than 200A.

Engineering Judgement/Diversity Approach

Assume a diversity factor of 30% for the 50-amp receptacles. Assume a diversity factor of 50% for the 30-amp receptacles. Calculated Load: 50-Amp Receptacles: (4 slips x 50A) x 0.30 = 60A 30-Amp Receptacles: (4 slips x 30A) x 0.50 = 60A Total = 120ABased on this example, you might be able to put all four slips on a 200-amp service. However, this is heavily dependent on the assumptions you make about diversity. You need solid justification (load monitoring data, historical data from other marinas) to support those assumptions. This is where the "engineering judgement" comes in.

4. Communication with the Authority Having Jurisdiction (AHJ)
Crucially important. Meet with the local electrical inspector/AHJ before starting the design. Explain your design approach and the rationale behind your diversity factors. Present any load monitoring data you have collected. Be prepared to discuss alternative approaches if the AHJ is uncomfortable with your assumptions. Document everything in writing.5. Safety & Grounding Marina environments are particularly harsh due to moisture and corrosion. Pay close attention to proper grounding and bonding. See Article 555. Use corrosion-resistant materials. Ground Fault Circuit Interrupters (GFCIs) are required on all 15A, 20A, and 30A receptacles. Consider GFCI protection for 50A receptacles as well, even though the code doesn't strictly require it (it's a good safety measure).6. Consider Energy Management Systems

Modern energy management systems can monitor and control power consumption at each slip. These systems can help to limit demand peaks and prevent overloading the service. They can also provide valuable data for future expansion planning.

Important Considerations Summarized



Load Monitoring is Key

Get real-world data.

Engineering Judgement

Carefully assess the likely usage patterns.


Diversity Factors

Document your diversity factor assumptions thoroughly.

AHJ Approval

Get buy-in from the local electrical inspector
before you start.

Safety First

Proper grounding and GFCI protection are essential.*

Consider Energy Management:
Modern systems can improve efficiency and provide valuable data.In short, the absence of demand factors in Article 555 means you must rely on a more rigorous engineering approach, backed by data and communication with the AHJ. Good luck! Flag for review