Question: GMI am jumping from 2008 to 2020 in nyc and I have a questionin 3 family home can I use 3 meter stack for 3 apartments? or do they have to be individual meter cans. metering has service conductors.

Okay, this is a great question about electrical metering in a 3-family home in NYC. The answer depends on a few factors, particularly the utility company (Con Edison in NYC) and local building codes at the time. While it may have been acceptable in the past, there have been changes and it's essential to comply with the current regulations.

Here's the general breakdown, with a strong emphasis on consulting Con Edison directly



Generally, Individual Meter Cans are Required

Today (and likely also in 2020), Con Edison, as the utility, strongly prefers and often requires individual meter cans for each dwelling unit in a 3-family home. This allows for accurate billing of each tenant's energy usage, prevents disputes, and meets modern metering standards.

"3 Meter Stack" - Could refer to a multi-metering enclosure, where the meters are mounted in a single enclosure but
still individually feed each apartment.
This is different from a single set of service conductors with multiple meters. The term "stack" is a bit vague and the physical layout matters a lot. If your "3-meter stack" means a single set of service conductors feeding three separate meters within a single enclosure, it might have been acceptable in the past, especially in older buildings, but is increasingly less common and potentially non-compliant with 2020 and current codes. The key is whether the service conductors are appropriately sized for the total calculated load of all three units, and whether the installation meets all applicable codes. Service Conductors vs. Feeder Conductors



Service Conductors

These are the conductors from the utility company's service point (usually a transformer or street connection) to the service disconnect(s) and meter(s). They are the primary conductors.

Feeder Conductors

These are conductors that run from the service disconnect (or a subpanel) to a specific load, like an individual apartment's panel.


Why Individual Meter Cans are Preferred (and Often Required)



Accurate Billing

Each tenant pays for their own usage.


Code Compliance

Modern electrical codes often require individual metering for multi-family dwellings.

Avoids Disputes

Landlord/tenant disagreements over electricity bills are minimized.


Easier Load Management

Con Ed can better manage the load on the system.

Key Things You MUST Do (Especially when Jumping from 2008 to 2020 and considering current code)


Contact Con Edison (Con Ed)

This is the absolute most important step. Call their engineering or service connection department. Explain the situation: You have a 3-family home, and you want to know the requirements for electrical metering in 2020 (or, better yet, now, since you're upgrading/evaluating now). Ask specifically: "Is it required to have individual meter cans for each apartment in a 3-family home in NYC?" "What are the Con Edison specifications for service connections and metering for a 3-family home?" "Can I provide my address/block/lot so you can check if there are any existing records on file?" "What are the requirements for the service entrance conductors and grounding?"2.

Consult with a Licensed Electrical Contractor in NYC

A qualified electrician who is familiar with NYC electrical codes and Con Edison requirements can evaluate the existing installation, determine what needs to be upgraded or changed to meet current standards, and handle the permitting and inspection process. They can also perform a load calculation to ensure your service is properly sized.3.

Review NYC Electrical Code

The NYC Electrical Code is based on the National Electrical Code (NEC), but with local amendments. Your electrician will be familiar with it, but you can also find a copy online and review the sections on service entrances and metering.4.

Permitting and Inspection

Any electrical work involving the service entrance and metering absolutely requires a permit from the NYC Department of Buildings (DOB) and an inspection to ensure compliance. Your licensed electrician will handle this.

In summary

While a "3-meter stack" might have been acceptable in some older installations, the trend is strongly toward individual meter cans for each apartment in a 3-family home.

Do not proceed without contacting Con Edison and consulting with a licensed electrician.
They will be able to provide definitive answers based on your specific location and the current regulations. Flag for review