User: fastline, Location: midwest usa
Asked on: Wednesday, November 12, 2025 at 1:14 pm EST
Answered on: Wednesday, November 12, 2025 at 1:14 pm EST
Question: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://download.schneider-electric.com/files?p_enDocType=Instruction+sheet&p_File_Name=PHA52731.pdf&p_Doc_Ref=PHA52731I stumbled into this and have to admit I haven't been into one quite like this. What I am trying to visualize is any use of the plug-on neutral bars that get disconnected with the transfer switching. It appears you could configure some load shedding with this setup.
Okay, I've reviewed the instruction sheet PHA52731 for the Schneider Electric Automatic Transfer Switch (ATS). You're right, the plug-on neutral bars and how they're connected (or disconnected) during transfer are key to understanding its operation, especially regarding potential load shedding.Here's a breakdown of the relevant aspects and how they relate to your questions about plug-on neutrals and load shedding
Key Takeaways and Potential Load Shedding Configuration:
Dual Neutral Bars
The ATS has two neutral bars: one for the utility/normal source and one for the generator/emergency source.
Disconnected Neutrals During Transfer
This is the crucial point. When the ATS switches, the
neutral connection for the disconnecting power source is also disconnected. This is intentional. Why Disconnect the Neutral? Disconnecting the neutral ensures that the generator's neutral is isolated from the utility neutral during generator operation. This is vital for safety (preventing circulating currents) and to ensure proper operation of GFCI/AFCI devices. Load Shedding Potential (The "Aha" Moment)
Because the neutral connection is switched along with the power conductors, you can create a circuit where the LOAD is ONLY functional on the utility side, or ONLY functional on the generator side. If you have critical loads that absolutely need power on the generator, then you can wire them to that neutral and the generator side. Any circuits that don't get wired like that will be shed.
How Load Shedding Could Be Implemented
Identify Critical and Non-Critical Loads
Determine which loads must have power during a generator outage (e.g., life support equipment, essential lighting) and which can be shed (e.g., some HVAC, non-essential appliances).2.
Wiring Strategy
Critical Loads
Wire these loads to the generator-side neutral bar and the generator power connections of the ATS. These will always be powered when the generator is running.
Non-Critical Loads
Wire these loads to the utility-side neutral bar and the utility power connections of the ATS. These will only be powered when the utility is the active source.3.
Automatic Operation
When the ATS switches to generator power, the utility-side neutral (and therefore the non-critical loads) is disconnected. This effectively sheds those loads. When utility power returns, the ATS switches back, reconnecting the utility-side neutral and powering the non-critical loads again.
Important Considerations
Code Compliance
Any load shedding scheme must comply with local electrical codes. Proper labeling and documentation are essential.
Grounding
The grounding system is critical for safety. Consult the instruction sheet and a qualified electrician to ensure proper grounding connections at the ATS and the generator.
Generator Sizing
Accurately calculate the load demand of the critical circuits to ensure the generator is adequately sized.
Professional Installation
Due to the complexities of ATS wiring and the safety implications, always have a qualified electrician perform the installation and configuration.
In Summary:
The key to visualizing this is understanding that the ATS disconnects the neutral of the outgoing power source. This feature, while primarily for safety and proper device operation, can be leveraged to create a simple, automatic load shedding system by strategically wiring critical loads to the generator-side neutral. However, careful planning, code compliance, and professional installation are paramount. Flag for review