User: Jimmy7, Location: Boston, MA
Asked on: Thursday, November 13, 2025 at 7:48 am EST
Answered on: Thursday, November 13, 2025 at 7:48 am EST
Question: I have a customer who wants to run two circuits for an existing laundry closet that is located in a finished breezeway which is on a slab. I need to run the circuits across the unfinished basement and poke through to the laundry closet. They want two circuits in there due to the gas dryer, iron, washer, and rechargeable vacuum. The gas dryer is already installed, so working behind it will be a pain. In any case, would you just emt behind the washer and dryer on the finished Sheetrock wall? Sketch attachedSeparate question. If you’re installing a subpanel that has two factory installed ground bars the housing of the panel is sufficient, you don’t need to add a jumper between them, correct?
Okay, let's break down these questions about the laundry closet and subpanel.
Laundry Closet Circuits
Here's a recommended approach, along with considerations for your customer's situation and the provided sketch
Plan:
1. Assessment
First, confirm the following:
Local Codes
Crucially, verify your local electrical codes. The NEC provides a baseline, but local jurisdictions often have amendments. This is especially important for materials and specific requirements for laundry circuits.
Circuit Requirements
Determine the ampacity of the new circuits (likely 20A each).
Wiring Method
The following option uses EMT, which is a good choice for mechanical protection in an unfinished basement and provides a solid ground path.2.
Route Planning
Basement Run
Run the EMT across the unfinished basement, secured to the joists with appropriate EMT hangers. Maintain consistent spacing (typically every 4-6 feet, check your local code). Follow the guidance for distance below joists.
Penetration
Carefully choose your penetration point into the laundry closet. Aim for a spot that minimizes visibility and interference with existing utilities. If the wall is framed with wood studs, drill up high into a stud bay.
Laundry Closet Run
The recommendation for EMT behind the washer and dryer on the finished sheetrock wall is not a bad idea, but may be challenging due to the existing gas line and dryer.
Considerations
Gas Line Clearance
Absolutely essential! Maintain safe clearance from the gas line to the dryer. Consult your local codes for required clearance distances. If space is tight, consider re-routing the gas line by a qualified gas fitter to create more working room and clearance.
Accessibility
Plan your EMT runs so that you can access junction boxes for wiring connections after the washer and dryer are installed. This may involve using a combination of EMT and flexible metal conduit (FMC or liquidtight flexible metal conduit (LFMC)) to make the final connections to the receptacles.
Receptacle Placement
Install the receptacles in easily accessible locations that will accommodate the appliances without strain on the cords. Consider recessed receptacles.3.
Execution
Drilling
Use appropriate drill bits and hole saws for drilling through framing and sheetrock. Be careful not to drill into existing wiring or plumbing.
EMT Bending and Cutting
Use proper EMT bending and cutting tools. Deburr cut ends.
Fastening
Use appropriate EMT fittings and connectors. Securely fasten EMT to the wall and ceiling.
Wiring
Use appropriately sized conductors (typically 12 AWG for 20A circuits). Color-code your wiring consistently (black/red for hots, white for neutral, green/bare for ground).
Connections
Make all connections inside junction boxes. Use appropriate wire connectors (wire nuts or crimp connectors).
Testing
Thoroughly test all circuits with a multimeter and circuit tester before energizing. Verify voltage, polarity, and ground integrity.
Responding to Customer Concerns
Gas Dryer
Acknowledge that working behind the gas dryer is difficult. Explain your plan to minimize disruption and prioritize safety. Emphasize the need for proper gas line clearance and the potential need to re-route it by a qualified professional.
Two Circuits
Reinforce the importance of two circuits for the appliances and rechargeable vacuum. This prevents overloading and potential fire hazards.
Finished Space
Explain that the EMT will be run neatly and securely in the basement. In the laundry closet, the EMT will be run as discreetly as possible.
Important Considerations Regarding the Laundry Equipment Washer Outlet
The NEC requires a dedicated 20-amp circuit for the washing machine receptacle.
Dryer Outlet
The NEC states that an individual branch circuit must supply the dryer.
Location
The NEC states that receptacles shall not be installed in a face-up position in the countertop.
Subpanel Ground Bars
You are likely correct, but it depends on the subpanel manufacturer's instructions. Factory-Installed
If the subpanel comes with two ground bars that are factory-bonded to the enclosure (the metal box), then
no, you do not need to add an additional jumper between them. The factory bonding provides the necessary connection. Verify
Always consult the subpanel's installation instructions. They will explicitly state whether or not a jumper is required. If the instructions are unclear, contact the manufacturer's technical support.
If Not Bonded
If the ground bars are not factory-bonded to the enclosure, or if there's any doubt, then
yes, you must install a grounding jumper wire between the ground bars and the metal enclosure. This ensures a proper grounding path.
In summary: Follow local codes rigorously. Prioritize safety, especially around the gas line. Communicate clearly with your customer. Verify the subpanel's grounding requirements. Test everything thoroughly. Flag for review