Topic: Hospital Grade Receptacles

User: georgeswe, Location: The Republic of Southern California

Asked on: Tuesday, December 28, 2010 at 2:54 pm EST
Answered on: Monday, May 13, 2024 at 11:35 pm EDT

Question: We are trying to get through plan check at a dental office in downtown Los Angeles. The Plan Checker is saying that I have to install Hospital Grade Receptacles per a correction. I have been looking at Article 517 and we did provide a redundant ground MC to satisfy the 517.12 "wiring methods" portion. However, I?m having a hard time locating where we need to install the Hospital Grade Rec. This Facility does not have med gas nor hospital beds. Although they are calling the rooms as OP 1, Op 2, these rooms are not operating rooms. I have an appointment tomorrow to clear the corrections and want to make sure I?m in the right. Any help would be appreciated.

Hospital Grade Receptacles (HGRs)

HGRs are typically required in medical facilities where the continuity of electrical power is critical for life-saving equipment. However, the NEC does not explicitly require HGRs in dental offices.

NEC Article 517

Article 517 of the NEC applies to healthcare facilities, including dental offices. However, Section 517.12, which addresses wiring methods, does not require HGRs. Instead, it requires a redundant ground conductor (RGC) for "grounded circuits that are part of the normal electrical system."Your Situation

Based on the information you have provided, it appears that you have already satisfied the NEC requirements by providing an RGC. Therefore, it is not clear why the Plan Checker is requiring HGRs.

Recommended Course of Action Review the Plan Checker's Correction

Determine the specific reason why HGRs are being required.


Consult with a Qualified Electrical Inspector

Get an independent opinion on whether HGRs are necessary in your facility.

Attend the Appointment Prepared

Gather any relevant documentation, including the NEC code and the Plan Checker's correction, to support your argument.


Be Respectful but Assertive

Explain your understanding of the NEC requirements and why you believe HGRs are not necessary.

Offer Alternative Solutions

If the Plan Checker insists on HGRs, you could propose alternative solutions such as installing GFCI receptacles or bonding the receptacle mounting box to the RGC.


Consider Appealing the Decision:
If the Plan Checker still requires HGRs, you may have the option to appeal the decision to a higher authority. Flag for review