User: Little Bill, Location: Tennessee NEC:2017
Asked on: Tuesday, December 28, 2010 at 8:42 pm EST
Answered on: Monday, May 13, 2024 at 11:36 pm EDT
Question: I would like some of you Inspectors and ECs to chime in on this. I am planning on an addition to my house. I will do the wiring myself. As my house is now, the GEC is tied into the service drop then down 1/2" emt into the house. It is run to the metal water piping in the house and not into the panel. First of all, the water pipes enter the house more than 5' from the service panel. I'm not sure what the code required when the house was built in the mid 80's. My question is, will an inspection on my addition cause me to have to change how my GEC enters and connects in the house? Also, would there be any advantage/reason to running the GEC into the panel and landing on the ground bar regardless of whether I do the addition or not? The panel does have the neutral and ground bar connected by a bracket and bonded to the panel. Need some thoughts on this.Thanks
Will an inspection on your addition cause you to have to change how your GEC enters and connects in the house?
Yes, it is likely that an inspection on your addition will require you to change how your GEC enters and connects in the house. The current installation does not comply with the current National Electrical Code (NEC), which requires that the GEC be connected to the grounding electrode system (GES) within 5 feet of the point where the service conductors enter the building.
Why does the GEC need to be connected to the GES within 5 feet of the service entrance?
The GEC provides a low-impedance path for fault current to return to the source. This helps to protect people and property from electrical shock and fire hazards. By connecting the GEC to the GES within 5 feet of the service entrance, the NEC ensures that the GEC can provide this low-impedance path even in the event of a lightning strike or other fault condition.
Should you run the GEC into the panel and land on the ground bar?
Yes, it is generally a good practice to run the GEC into the panel and land on the ground bar. This provides a central location for all grounding connections and ensures that the GEC is connected to the panel in a way that is both safe and reliable.
Conclusion
It is likely that an inspection on your addition will require you to change how your GEC enters and connects in the house. It is also a good practice to run the GEC into the panel and land on the ground bar. These changes will help to ensure that your electrical system is safe and compliant with the current NEC. Flag for review