Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: House load metering on Residential Switchboard

User: Kartracer087, Location: Milwaukee WI

Asked on: Wednesday, January 5, 2011 at 12:31 am EST
Answered on: Monday, May 13, 2024 at 11:49 pm EDT

Question: OK, here is the situation:You have a switchboard (lets say 2000A) and its fed from a utility transformer at 480Y/277V. The service conductors enter the switchboard and terminate in a 2000A main device. The main device feeds a 1000A bus duct which feeds dry type transformers. These transformers feed meter centers for apartment tenant units. Is it possible to add on another section to this switchboard and power about 600A worth of house loads? How would you meter that, would you simply use a separate section in the switchboard with a utility CT compartment and 600A circuit breaker? Or, would you generally be required to have the house loads on a separate service entrance?Thanks.

Is it possible to add on another section to this switchboard and power about 600A worth of house loads?

Yes, it is possible to add another section to the switchboard to power the house loads. However, it requires careful planning and consideration of the following factors: Available capacity

The existing switchboard must have sufficient spare capacity to accommodate the additional load. In this case, the switchboard has a 2000A main device, but it is currently only feeding a 1000A bus duct. Therefore, it has 1000A of spare capacity.


Code requirements

Local codes may require separate service entrances for house loads and commercial loads. Check with your local code enforcement agency for specific requirements.

Safety and reliability

Adding another section to the switchboard increases the complexity of the system. It is important to ensure that the new section is properly designed and installed to prevent safety hazards and ensure reliable operation.

How would you meter that?


There are two common methods for metering the house loads:
Submetering

Install a separate electric meter in the new section of the switchboard to measure the consumption of the house loads. This method allows for accurate billing and monitoring of the house load consumption.

Main meter

Use the existing electric meter that is measuring the consumption of the apartment tenant units. This method is simpler to implement, but it does not provide separate metering for the house loads.

Separate service entrance


In some cases, it may be more appropriate to provide a separate service entrance for the house loads. This is typically done when the house loads are substantial or when there are specific code requirements that mandate it. A separate service entrance provides the following benefits:
Independent power supply

The house loads will have their own dedicated power supply, which can enhance reliability and reduce the risk of outages.

Separate metering

The house loads will be metered separately, allowing for accurate billing and monitoring of consumption.


Code compliance

Providing a separate service entrance may be required by local codes, especially in areas where there are fire safety concerns.

Recommendation


Based on the information provided, it is feasible to add another section to the switchboard to power the house loads. However, it is recommended to consult with a qualified electrician and local code enforcement agency to determine the specific requirements and the most appropriate solution for your situation. Flag for review

Previous Question Next Question