Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: demand factor for sub panel

User: romex jockey101

Asked on: Tuesday, January 18, 2011 at 7:24 pm EST
Answered on: Tuesday, May 14, 2024 at 12:25 am EDT

Question: i understand how to use demand factors when you are sizeing your main breaker and service feeding cables.. general lighting- sq foot times 3va.. 2 small appliance at 1500va etc.... but if you were to add a sub panel do you use same factors or just over size?...just a question that poped into my head

When sizing a subpanel and its feeder, demand factors can still be applied, but they may be different from the demand factors used for the main breaker and service feeding cables.

Demand Factors for Subpanels

Demand factors for subpanels typically consider the following:

Type of Load

Different types of loads (e.g., lighting, appliances, motors) have different demand factors.


Diversity Factor

This factor accounts for the likelihood that not all loads will be operating simultaneously.

Occupancy

The type of occupancy (e.g., residential, commercial, industrial) can also affect demand factors.

Oversizing Considerations

In certain cases, it may be necessary to oversize the subpanel and feeder even if demand factors are applied. This can be due to factors such as:


Future Load Expansion

Anticipating future load growth to prevent the need for future expansion.

Circuit Overload Protection

Oversizing the feeder and subpanel can provide additional protection against overloads and potential electrical hazards.


Electrical Codes and Standards

Local electrical codes and standards may require a certain level of oversizing for specific types of installations.

Steps to Size a Subpanel

To size a subpanel and feeder using demand factors:1. Determine the types of loads that will be connected to the subpanel.
2. Apply the appropriate demand factors based on the type of load and occupancy.3. Calculate the total load in amps by multiplying the total wattage by the appropriate demand factor.
4. Select a subpanel with a current rating equal to or greater than the calculated load.5. Size the feeder cable using the same method, considering the length and voltage drop requirements.
6. Verify that the subpanel and feeder meet the requirements of local electrical codes and standards.


Example

Suppose you are adding a subpanel to a residential house to supply a new kitchen with the following loads: 4 lighting circuits (120V, 20A each) 2 small appliance circuits (120V, 15A each) 1 refrigerator (120V, 10A) 1 electric range (240V, 40A)

Demand Factors

Lighting: 3 VA/sq ft 1000 sq ft 0.75 (diversity factor) = 2250 VA Small appliances: 2 1500 VA = 3000 VA Refrigerator: 100% Electric range: 100%

Total Load

(2250 VA + 3000 VA + 1000 VA + 4000 VA) / 120 V = 86.25 A

Subpanel and Feeder Sizing:
Subpanel: 100A (to accommodate the calculated load)* Feeder: 100A, 2-wire plus ground (based on length and voltage drop calculations) Flag for review

Previous Question Next Question