User: dbehounek, Location: Denver, CO
Asked on: Wednesday, January 19, 2011 at 3:52 pm EST
Answered on: Tuesday, May 14, 2024 at 12:28 am EDT
Question: I'm stuck between the power company(Xcel) and the NEC. Xcel says the service mast through the roof cannot be higher than 4' above the roofline where the NEC says that, since the pitch of the roof is less than a 4" in 12", I have to clear it by 8'....can anyone tell me how to beat one or the other into submission here?
Resolving the Discrepancy
1.
Refer to the Local Authority Having Jurisdiction (AHJ)
The local Building Department or Electrical Inspector is the final authority on code interpretations. Contact them and explain the situation. They can provide guidance and make a ruling based on local regulations.2.
Check Municipal Codes
Some municipalities have additional requirements or amendments to the NEC. Review the local municipal code to determine if there are any specific regulations related to service mast heights.3.
Contact NEC Technical Support
The National Electrical Code Technical Support Committee can provide clarifications on code interpretations. You can contact them directly or through their website.
Negotiating with Xcel
1.
Explain the NEC Requirement
Present Xcel with the 8-foot clearance requirement from Section 230.24 of the NEC. Explain that this requirement applies to roofs with a pitch less than 4" in 12".
2.
Provide Supporting Evidence
If possible, obtain a letter from the local AHJ or NEC Technical Support confirming the 8-foot clearance requirement.3.
Offer a Compromise
If Xcel is unwilling to raise the mast to 8 feet, propose a compromise that meets the intent of the NEC. For example, you could request a height of 6 feet above the roofline with an additional barrier or grounding rod to mitigate any potential hazards.
Negotiating with the NEC
1.
Provide Justification
If the local AHJ or NEC Technical Support Committee determines that the 8-foot clearance requirement is not applicable, you can present them with your justification for a lower mast height.2.
Consider Alternative Methods
Explore alternative methods to ensure safety, such as using a different type of service entrance or installing additional grounding.3.
Seek a Code Amendment: If all other options fail, you can consider proposing a code amendment to the local AHJ or NEC. This is a complex process that may require support from industry experts and a thorough analysis of the safety implications. Flag for review