User: wmeek, Location: Texas
Asked on: Wednesday, January 19, 2011 at 10:09 pm EST
Answered on: Tuesday, May 14, 2024 at 12:29 am EDT
Question: Is it code compliant to take the building Steel GEC to a steel Purlin rather than a Column. Also can you jumper the water pipe GEC from water pipe to building steel rather than back to the service.
NEC requires the GEC to be taken to the service enclosure or other grounded point within the structure. This means that the GEC cannot be taken directly to a purlin but must be extended to a column that supports the purlin. This is because the purlin is not considered to be a grounded part of the structure.You can not bond the building GEC to the water pipe then back to the service. This will create a parallel path for lightning and fault currents that could lead to equipment damage and/or a safety hazard. The grounding electrode conductor should be connected to the water pipe at the service entrance and then to the building steel at the service entrance. This will ensure that the GEC is connected to the service entrance and the building steel, which are both grounded. Flag for review