Question: Is there a rule of thumb or some sort of percentage that can be used when dealing with Parallel feeder runs and the issues within the code.My concern is with multiple parallel runs and how they are terminated involving relatively short runs... 6 parallel runs of less than 100'Is there a rule of thumb or percentage that can work to ensure there will not be one common phase conductor is pulling more of the load than the other common phase conductors with in the parallel.Someone mentioned 1%.... if that is the case, than 1% of the 100' run would be 12". Doesn't that sound like too much of a difference? (5 A phase conductors equal 100' and the 6th phase conductor is 99'). Is this acceptable?I guess to truely find the answer, I will be forced to do a resistance test on all of the common phases to ensure they are all equal (resistance wise) to meet the requirments of the code, because it is impossible to ensure they are all the "same" length as they are installed in a ductbank.
Rule of Thumb for Parallel Feeder Runs
1-2% Length Difference
It is generally acceptable to have a length difference of up to 1-2% between parallel feeder runs.
Application to Your Scenario
6 parallel runs of less than 100' each 1% of 100' = 1' 99' is within the 1-2% length difference rule of thumb
Acceptable Variation
A length difference of 1' between one common phase conductor and the others (99' vs. 100') is considered acceptable under the 1-2% rule of thumb.
Resistance Testing
Resistance testing is not typically required to ensure equal loading between parallel feeders, as the length difference is small enough to have negligible impact on resistance.
Additional Considerations: If the parallel runs are significantly longer than 100', a more precise method of balancing may be necessary. The rule of thumb assumes similar impedance characteristics for all parallel conductors.* It is always advisable to strive for the closest possible length matching between parallel runs to minimize potential load imbalances. Flag for review