Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: One meter, two panels

User: Keri_WW, Location: SW Florida

Asked on: Thursday, January 20, 2011 at 7:06 pm EST
Answered on: Tuesday, May 14, 2024 at 12:32 am EDT

Question: Is it acceptable to run from a meter on the outside of a building to the tenant space, hit a disconnect, then a wiring gutter, and finally branch off to two panels?I think it is but just wanted to triple check as I don't do a lot of work with tenant metering and such.EDIT; Is it ok if the disconnect is on the outside next to the meter?Thanks!!Keri

Yes, it is acceptable to run from a meter on the outside of a building to the tenant space, hit a disconnect, then a wiring gutter, and finally branch off to two panels.

Regarding the location of the disconnect

The National Electrical Code (NEC) requires a readily accessible disconnect switch for tenant spaces. The location of the disconnect switch is not explicitly specified in the NEC, but it is generally recommended to be located near the point of entry to the tenant space.Placing the disconnect switch on the outside of the building next to the meter is acceptable if it meets the following criteria:

Readily accessible

The disconnect must be within reach of the tenant without having to enter the building.


Protected from the weather

The disconnect must be enclosed in a weatherproof enclosure.*

Labeled:
The disconnect must be clearly labeled to indicate its purpose.It is important to note that some local building codes or utility regulations may have specific requirements for the location of the disconnect switch. Always check with local authorities to ensure compliance. Flag for review

Previous Question Next Question