Question: I am designing a project that in the sub main electrical room (below grade) I have a 800 amp drip loop section from that section I have approximately 10ft to the Main Switch / Meter section. Is it to code to run the un-fused service feeders in GRC conduit(s) within the electrical room to the Main Switch?
Yes, it is generally permitted by the National Electrical Code (NEC) to run un-fused service feeders in GRC (Glass-Reinforced Concrete) conduit within the electrical room to the Main Switch, provided that certain conditions are met.
NEC Requirements
NEC 310.15(B)(2)(4)
Service-entrance conductors shall not be required to be protected against short circuits and overcurrent by fuses or circuit breakers where the conductors are installed in a raceway that is located under a building or structure and is not subject to physical damage.
NEC 310.15(B)(5)
For the protection of service-entrance conductors, the raceway shall be of rigid metal, intermediate metal conduit, liquidtight flexible nonmetallic conduit, or liquidtight flexible metal conduit.
GRC Conduit Properties
GRC conduit is a type of rigid nonmetallic conduit that meets the requirements for a raceway for service-entrance conductors according to NEC 310.15(B)(5). It has the following properties:
Durability
GRC conduit is resistant to corrosion, moisture, and physical damage.
Fire resistance
GRC conduit is fire-resistant and helps maintain circuit integrity during a fire.
Ease of installation
GRC conduit is lightweight and easy to install compared to metal conduit.
Considerations
Ensure that the GRC conduit is sized appropriately for the number and size of service-entrance conductors. Secure the conduit properly to prevent any movement or displacement. Provide appropriate grounding and bonding according to NEC requirements.* The GRC conduit should be installed within the electrical room below grade and not exposed to the elements.
Conclusion:
Based on the NEC requirements and the properties of GRC conduit, it is generally permissible to run un-fused service feeders in GRC conduit within the electrical room to the Main Switch, provided that the conduit is sized appropriately, securely installed, and properly grounded and bonded. Flag for review