Question: Was wondering what the best set up was for pulling about 100 ft of 4 #3/0 & 1 #6 in an existing 2 inch pvc with 4 sweeps, installing new 120/208 panel in TIsince 30 ft of the pvc is exposed in TI would it be wise to replace the sweeps with emt the rest of the run is under concrete to switch gear.Kellem grip, lots of lube and rent a tugger was my plan??TIA
Best Setup for Pulling Cables in Existing 2-Inch PVC
Materials
Kellem grips or similar cable-pulling grips Cable lubricant Tugger (optional but recommended for long pulls) EMT conduit (optional, if replacing sweeps)
Procedure
1.
Lubricate Cables
Apply a generous amount of cable lubricant to the cables.2.
Secure Kellem Grips
Attach Kellem grips to each cable.3.
Feed Cables into PVC
Start by feeding the cables a few feet into the PVC.4.
Install Tugger (optional)
If using a tugger, attach it to the Kellem grip on the largest cable (#3/0).5.
Pull Cables
Use the tugger or manually pull the cables through the PVC. Keep the cables taut and lubricated throughout the pull.6.
Negotiate Sweeps
The sweeps in the PVC can be challenging to navigate. Use a fish tape or pulling rod to guide the cables through.7.
Replace Sweeps with EMT (optional)
If desired, replace the exposed sweeps with EMT conduit to reduce friction.8.
Pull Cables Through Exposed PVC
Once the cables have cleared the sweeps, pull them through the remaining exposed PVC portion.
Tips
Use a pulling head or fish tape to guide the cables around tight bends. Keep the Kellem grips tight and check them regularly to ensure they are not slipping. If the pull becomes difficult, apply more lubricant or use a tugger. Allow the cables to rest periodically to reduce tension. Protect the cables from damage by using plastic covers or wrapping them in fabric.
Additional Considerations: The length, number of bends, and condition of the PVC will affect the pulling difficulty. The combined cross-sectional area of the cables should not exceed 40% of the conduit's cross-sectional area. Ensure the circuit breakers or fuses in the new panel are properly sized for the installed cables. Flag for review