Question: Ran across this last week, an old over head temp that was left to power the well. POCO paid an EC to convert the well service to underground to clear a low service wire violation.
Overhead Temporary Service Purpose
To temporarily provide power to a well while the permanent underground service is being installed.
Characteristics
Typically consists of a single-phase line run overhead from a nearby pole or existing electrical infrastructure. May have a fuse or circuit breaker to protect against overloads. Uses temporary connections and materials, such as weatherproof wire and pole clamps.
Underground Conversion Reason for Conversion
To eliminate overhead service wire violations, such as low wires posing a hazard to vehicles or pedestrians.
Process
Electrical contractor (EC) excavates a trench for the underground conduit. Conduit is installed and connected to the electrical panel or service entrance. Overhead service is disconnected and removed. New underground service cable is pulled through the conduit and connected to the well pump.
Power Company Involvement Payment for Conversion
Power company is responsible for paying for the underground conversion to comply with safety regulations.
Inspection and Approval
Power company may inspect the new underground service to ensure proper installation and safety.
Benefits of Underground Conversion Improved Safety
Eliminates the hazard of overhead wires coming into contact with vehicles or people.
Increased Reliability
Underground cables are less susceptible to damage from storms or other events.
Enhanced Aesthetics
Hides electrical wires from view, improving the appearance of the property.*
Long-Term Savings: Underground service typically has a longer lifespan and requires less maintenance than overhead service. Flag for review