Topic: working or not working

User: MBLES, Location: Miami Fla.

Asked on: Thursday, February 3, 2011 at 8:21 pm EST
Answered on: Tuesday, May 14, 2024 at 1:08 am EDT

Question: I was asked to submit bid for lighting in a very old warehousethat is used for storage. They now want lighting. The buildingsare 100x150 (x7) and built like parking garage. I already askedmaintenance guy why didnt they just screw in lights in socketshe said they didint work. They want 4 lights in each corner withlight switch but they want it to run 24/7. I bid job for x amountI plan on mc it to death with 4lamp f32 8' strips. What do youguys bid for?

Bid Considerations



Scope of Work

4 lights in each corner of 7 warehouses, each measuring 100x150 feet, running 24/7.


Lighting Requirements

4-lamp F32 8' fluorescent strip lights.

Wiring

MC cable for distribution.


Electrical Panel

Availability and capacity.

Labor

Installation, materials, and cleanup.

Estimated Bid Price

To provide an accurate bid, it's essential to gather additional information, such as:


Electrical Inspection

Determine the condition of the existing electrical system and the need for upgrades.

Wiring Distance

Calculate the total distance of wire required for each warehouse.


Labor Costs

Estimate the time and labor required for installation.

Materials Cost

Obtain quotes for materials, including lights, MC cable, switches, and junction boxes.Based on these factors, a reasonable bid for this project could range from

$20,000 to $40,000 per warehouse
.

Additional Considerations



Lighting Control

Consider installing motion sensors or timers to optimize energy consumption.

Maintenance

Include a maintenance plan to ensure the longevity of the lighting system.


Warranty:
Offer a warranty on materials and labor. Flag for review