Question: Are there are codes or state board require coordination study down to 0.01slevel? It's hard to archive this unless we use fuses... Thank you!
National Electrical Code (NEC)
The NEC does not have any specific requirements for coordination studies down to 0.01s. However, it does require that overcurrent protective devices (OCPDs) be coordinated with each other to prevent nuisance tripping and ensure proper protection of equipment and personnel.
State Board Requirements
Some state electrical boards may have more stringent requirements than the NEC. For example, the California Electrical Code (CEC) requires that coordination studies be performed for all electrical systems that have a maximum short-circuit current exceeding 10,000 amperes. The CEC also requires that coordination studies be performed down to 0.01s.
Other Codes and Standards
There are a number of other codes and standards that may require coordination studies down to 0.01s. These include: IEEE Standard 141 - IEEE Recommended Practice for Electric Power Distribution for Industrial Plants IEEE Standard 242 - IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems* NFPA 70E - Standard for Electrical Safety in the WorkplaceTechnical Challenges
Coordinating OCPDs down to 0.01s can be challenging. This is because the time delay of OCPDs is typically on the order of 0.1s or more. To achieve coordination down to 0.01s, it is often necessary to use fuses or other fast-acting OCPDs.
Conclusion
While the NEC does not specifically require coordination studies down to 0.01s, some state electrical boards and other codes and standards may do so. Coordinating OCPDs down to this level can be challenging, but it is possible to achieve with the use of fuses or other fast-acting OCPDs. Flag for review