Question: Has anyone installed an electric submeter on main switch gear before? What is the best way to make the voltage connections to the meter? Usually I would find a small subpanel and put a 15 amp breaker in and use that to power the meter and supply the voltage feed. In this case all I have is the main switch gear. Can you tap off the main bus bar somehow and go to fuses?Thanks!

Installing Electric Submeter on Main Switch GearVoltage Connection Methods



1. Voltage Taps Off Main Bus Bar

Use voltage taps specifically designed for switchgear bus bars. Ensure the taps meet the manufacturer's specifications for current capacity and insulation. Connect the taps to the desired phase conductors on the bus bar.

2. Voltage Transformers (VTs)

Install VTs to step down the voltage to a level suitable for the submeter. Use VTs with appropriate voltage ratios and accuracy ratings. Connect the VTs' primary terminals to the main bus bar and the secondary terminals to the submeter.

Current Connection Methods



1. Current Transformers (CTs)

Install CTs on the conductors supplying the load you want to measure. Ensure the CTs have suitable current ratios and meet the submeter's input specifications. Connect the CTs' secondary terminals to the submeter.

2. Open CTs

If the switchgear has open CTs already installed, use them to provide current signals to the submeter. Ensure the open CTs have appropriate turns ratios and accuracy ratings. Connect the open CTs' secondary terminals to the submeter.

Powering the Meter

Since you have no subpanel available, it's recommended to use a small auxiliary power transformer (APT) to power the submeter. Connect the APT's primary terminals to a voltage tap or VT on the main bus bar. Connect the APT's secondary terminals to a small subpanel or terminal block that supplies power to the submeter and any other devices (e.g., relays).

Safety Considerations:
Wear proper personal protective equipment (PPE) during the installation. De-energize the equipment before making any connections. Ensure all connections are secure and insulated properly.* Follow manufacturer's instructions and local electrical codes for safe installation. Flag for review