Question: I have been designing electrical systems for Class 1 Div 2 areas for years, and whenever I use a lighting panel with EPD breakers, they have always come with a "TEST" button on the front for those breakers. Naturally, it is to test that the breaker trips when it is supposed to. Recently, I have heard that this is not required by code, that I can use EPD breakers without having a test button.Something about this doesn't add up in my opinion. Does anyone have any insight on this? Is it a new revision to the code? My latest codebook is 08.
The requirement for a "TEST" button on EPD breakers in Class 1 Div 2 areas is not explicitly specified in the National Electrical Code (NEC). However, it is generally recommended and considered good practice to have a test button available to ensure the proper functioning of the EPD breakers.The NEC does not prohibit the use of EPD breakers without a test button, but it is important to consider the following factors: Safety
A test button allows for periodic testing of the EPD breaker's trip functionality, which is crucial for ensuring the safety of the electrical system and personnel working in the area.
Reliability
Frequent testing of the EPD breaker can help identify potential issues early on, preventing unexpected outages or failures that could have severe consequences.*
Code compliance
While the NEC may not explicitly require a test button, it is important to follow industry standards and best practices, which often recommend the use of test buttons.
New Code Revisions
There have been no significant changes or revisions to the NEC requirements related to EPD breakers in Class 1 Div 2 areas in recent editions of the code. The 2008 NEC, which you are referencing, is still valid for this purpose.
Recommendations:
It is strongly recommended to use EPD breakers with a test button in Class 1 Div 2 areas for safety, reliability, and code compliance purposes. If you are unsure about the specific requirements for your project, it is always advisable to consult with a qualified electrician or refer to the latest edition of the NEC. Flag for review