Question: I am designing a switchgear installation (480Y/277) that will be fed by a Utility wye-wye 2500kva transformer. The utility intends on grounding the neutral to a ufer in the vault. They want me to bring my 11 sets of 4-500 kcmil to the transformer and connect the switchgear neutral bus to the switchgear ground bus. If I were to do that, how should I size the ground ring and electrodes at the switchgear and will that cause a problem with the neutral being grounded at two points?
Ground Ring and Electrode Sizing
For a 2500 kVA transformer, the ground ring and electrodes should be sized according to the following formula:
R = I ρ / 2πwhere: R = resistance of the ground ring (ohms) I = fault current (amps) ρ = soil resistivity (ohm-meters)Fault Current CalculationsI = k S / Vwhere: I = fault current (amps) k = fault current multiplier (typically 10 for 3-phase faults) S = transformer rating (VA) V = transformer primary voltage (V)For a 2500 kVA transformer, the fault current is approximately:I = 10 2500 kVA / 480 V = 5208 AGround Ring SizingR = 5208 A 100 ohm-m / 2π = 832 ohmsThis corresponds to a copper ground ring with a circumference of approximately 80 feet.N = R / R_ewhere: N = number of electrodes R = required resistance of the ground ring R_e = resistance of a single electrodeAssuming a resistance of 25 ohms for a single 8-foot ground rod, the number of electrodes required is:N = 832 ohms / 25 ohms = 33 electrodesNeutral Grounding