User: metallica5, Location: Metro DC
Asked on: Wednesday, February 16, 2011 at 2:30 pm EST
Answered on: Tuesday, May 14, 2024 at 1:39 am EDT
Question: Have a municipal customer looking for a turnkey 75-85kw photovoltaic system to supplement their Department of Public Works building. They do not have time to go out to have this designed due to grant deadlines. They are looking to us to come up with a game plan to install panels on the ground a few hundred feet from their building. Next is to connect with grid tie to their 3 phase 480 gear. Does anyone know a site online that has diagrams and systems to purchase for installation? Any suggestions from someone experienced in this?
Turnkey Photovoltaic SystemDesign and Installation Solar Solutions USA
https://www.solarsolutionsusa.com/
Sunrun
https://www.sunrun.com/
Vivint Solar
https://www.vivintsolar.com/
System Components Panels
SUNPOWER 430W or LG 430W panels
Inverters
SolarEdge SE76K inverters (3)
Mounting System
Unirac SolarMount for ground mount system
Grid Tie Transformer
Delta Electronics DTPF1000-480 (480V/120V)
Protection Devices
Fuses, circuit breakers, and surge protector
Online Resources Rewiring America's Solar Future
https://rewiringamericasolarfuture.org/
Interstate Renewable Energy Council (IREC)
https://irecusa.org/resource-library/
National Renewable Energy Laboratory (NREL)
https://www.nrel.gov/
Suggestions Conduct a site assessment
Determine the available space, sun exposure, and electrical infrastructure.
Estimate energy consumption
Calculate the department's monthly electricity usage to determine system size.
Research incentives
Check for federal, state, and local incentives for solar installations.
Hire a qualified contractor
Ensure the contractor has experience with ground-mounted solar systems and grid tie installations.
Obtain permits
Secure the necessary permits from local authorities.*
Monitor performance: Regularly track system output to ensure optimal performance and energy savings. Flag for review