Topic: Photovoltaic Diagram Needed

User: metallica5, Location: Metro DC

Asked on: Wednesday, February 16, 2011 at 2:30 pm EST
Answered on: Tuesday, May 14, 2024 at 1:39 am EDT

Question: Have a municipal customer looking for a turnkey 75-85kw photovoltaic system to supplement their Department of Public Works building. They do not have time to go out to have this designed due to grant deadlines. They are looking to us to come up with a game plan to install panels on the ground a few hundred feet from their building. Next is to connect with grid tie to their 3 phase 480 gear. Does anyone know a site online that has diagrams and systems to purchase for installation? Any suggestions from someone experienced in this?

Turnkey Photovoltaic SystemDesign and Installation Solar Solutions USA

https://www.solarsolutionsusa.com/


Sunrun

https://www.sunrun.com/

Vivint Solar

https://www.vivintsolar.com/

System Components
Panels

SUNPOWER 430W or LG 430W panels

Inverters

SolarEdge SE76K inverters (3)


Mounting System

Unirac SolarMount for ground mount system

Grid Tie
Transformer

Delta Electronics DTPF1000-480 (480V/120V)


Protection Devices

Fuses, circuit breakers, and surge protector

Online Resources
Rewiring America's Solar Future

https://rewiringamericasolarfuture.org/


Interstate Renewable Energy Council (IREC)

https://irecusa.org/resource-library/

National Renewable Energy Laboratory (NREL)

https://www.nrel.gov/

Suggestions
Conduct a site assessment

Determine the available space, sun exposure, and electrical infrastructure.

Estimate energy consumption

Calculate the department's monthly electricity usage to determine system size.


Research incentives

Check for federal, state, and local incentives for solar installations.

Hire a qualified contractor

Ensure the contractor has experience with ground-mounted solar systems and grid tie installations.


Obtain permits

Secure the necessary permits from local authorities.*

Monitor performance:
Regularly track system output to ensure optimal performance and energy savings. Flag for review