Question: A customer called today. He has 3phase service with 350mcm. He has a small gutter that feeds a 200 amp disconnect and a 200 amp panel. This place is an industrial laundry cleaning place. 37fla 480 volt dryers and other stuff like that.They want an additional 600 amps worth of service for new washers,dryers and ironing tables.what is the best way to achieve what they want? thanks for your ideas
Option 1: Upgrade to a Larger Feed Upgrade the existing 350mcm service to 500mcm or 750mcm. This will provide the capacity for the additional 600 amps. Install a new 800-amp disconnect and 800-amp panel to match the increased capacity. Ensure the supply transformer and electrical infrastructure can accommodate the higher amperage.
Option 2: Install a Parallel Service Install a separate 480-volt, 600-amp service using 250mcm or 350mcm conductors. Connect the new service to an independent disconnect and panel. This option provides redundancy and allows for future expansion without overloading the existing system.
Option 3: Install a Subpanel with Redundancy Install a 600-amp subpanel fed from the existing service. Use 250mcm or 350mcm conductors to connect the subpanel to the main panel. Equip the subpanel with a redundant breaker to ensure power remains available in case of a breaker trip.
Factors to Consider
Load Calculations
Determine the exact electrical load requirements for the new equipment and ensure the proposed upgrade can meet it.
Code Compliance
Ensure the installation complies with all applicable electrical codes and standards.
Cost
Compare the costs of each option and factor in materials, labor, and permitting fees.
Maintenance and Reliability
Consider the accessibility and maintenance needs of the equipment and electrical infrastructure.
Future Expansion
Plan for potential future expansion or equipment upgrades to avoid the need for additional upgrades in the future.
Recommended Approach:
Based on the information provided, Option 1 or 2 is recommended. Option 1 is more cost-effective if the existing transformer and infrastructure can accommodate the higher amperage, while Option 2 provides redundancy and flexibility for future expansion. It's advisable to consult with a qualified electrician to assess the specific needs and requirements of the facility. Flag for review