User: powerplay, Location: In front of a computer.
Asked on: Tuesday, March 1, 2011 at 10:31 pm EST
Answered on: Tuesday, May 14, 2024 at 2:14 am EDT
Question: I had been asked if in 1973 EMT was allowed to be used in an direct burial situation with the pipe used as the bond. The pipe has obviously eroded, and no separate bond wire was pulled inside. The job had supposedly been an engineered and approved method of installation. Anyone with an pre 1975 Electrical Code book??
Unfortunately, I do not have access to pre-1975 Electrical Code books, so I cannot provide information about the use of EMT in direct burial situations in 1973. Flag for review