Topic: Service Upgrade Question

User: jm1470, Location: Ca and Wa

Asked on: Monday, March 7, 2011 at 7:16 pm EST
Answered on: Tuesday, May 14, 2024 at 2:26 am EDT

Question: Im upgrading a service on a house currently the house has three 60 amp meter pans and 60 amp federal pacific panels. The meters are located inside the house along with the panels. The panels feed the apartments in the house. I'm going to move the meters to the outside. I was going to run 200 amp seu down to a trough then run 100 amp wiring to each meter pan. I was going to use offset nipples to each meter pan. Is this ok to do or does anyone have any other ideasThanks in advance

Acceptable Approach

Your proposed approach is generally acceptable according to the National Electrical Code (NEC).

Guidelines



Meter Location

Moving the meters to the outside is a common practice to improve accessibility and safety.


Wiring Size

Using 200 amp SEU cable from the service pedestal to the meter trough is appropriate for a 200 amp service.

Conduit and Offset Nipples

Using offset nipples to connect the trough to the meter pans is acceptable, provided the conduit size is sufficient to accommodate the larger conductors.


Fill Calculations

Ensure that the meter trough and conduit have sufficient room for the added conductors after the offset nipples are installed. Refer to NEC Tables for conduit fill requirements.

Grounding

Properly ground the trough and all equipment in the meter stack per NEC requirements.

Other Considerations



Meter Pedestal

Install a suitable meter pedestal to accommodate the new meters and service entrance conductors.

Conduit Support

Provide adequate support for the conduit and offset nipples to prevent any movement or strain.


Inspection and Permit

Obtain a permit and have the work inspected by a qualified electrical inspector to ensure compliance with code requirements.

Alternative Approaches



Upgrade Meter Base Units

Instead of using offset nipples, you could consider upgrading the meter base units to include a larger knockout for the larger conduit.


Install a Sub-Panel:
If feasible, you could install a sub-panel outside the house near the meter stack, connecting it to the main panel inside. This would reduce the amount of conduit and offset nipples needed.Ultimately, the best approach will depend on the specific circumstances and requirements of the installation. It is always recommended to consult with a qualified electrician for guidance and to ensure compliance with code regulations. Flag for review