Question: Im upgrading a service on a house currently the house has three 60 amp meter pans and 60 amp federal pacific panels. The meters are located inside the house along with the panels. The panels feed the apartments in the house. I'm going to move the meters to the outside. I was going to run 200 amp seu down to a trough then run 100 amp wiring to each meter pan. I was going to use offset nipples to each meter pan. Is this ok to do or does anyone have any other ideasThanks in advance
Acceptable Approach
Your proposed approach is generally acceptable according to the National Electrical Code (NEC).
Guidelines
Meter Location
Moving the meters to the outside is a common practice to improve accessibility and safety.
Wiring Size
Using 200 amp SEU cable from the service pedestal to the meter trough is appropriate for a 200 amp service.
Conduit and Offset Nipples
Using offset nipples to connect the trough to the meter pans is acceptable, provided the conduit size is sufficient to accommodate the larger conductors.
Fill Calculations
Ensure that the meter trough and conduit have sufficient room for the added conductors after the offset nipples are installed. Refer to NEC Tables for conduit fill requirements.
Grounding
Properly ground the trough and all equipment in the meter stack per NEC requirements.
Other Considerations
Meter Pedestal
Install a suitable meter pedestal to accommodate the new meters and service entrance conductors.
Conduit Support
Provide adequate support for the conduit and offset nipples to prevent any movement or strain.
Inspection and Permit
Obtain a permit and have the work inspected by a qualified electrical inspector to ensure compliance with code requirements.
Alternative Approaches
Upgrade Meter Base Units
Instead of using offset nipples, you could consider upgrading the meter base units to include a larger knockout for the larger conduit.
Install a Sub-Panel: If feasible, you could install a sub-panel outside the house near the meter stack, connecting it to the main panel inside. This would reduce the amount of conduit and offset nipples needed.Ultimately, the best approach will depend on the specific circumstances and requirements of the installation. It is always recommended to consult with a qualified electrician for guidance and to ensure compliance with code regulations. Flag for review