Question: Here is what I have.A residence with a 200a drop at the house and what will be a 200a drop at the garage. Two seperate meters. The water main and meter is in the house, but now the water line will be tapped into for supply of the garage. H.O. wants a light on the garage to be 3wayed from the house also. My question and concern is that since the water pipe and a switched load is shared between the two structures, do I simply pound my two ground rods and bond my water pipe in the garage main panel? Overthinking might be my case in this one. I guess this would be like two seperate services at two seperate houses,,,,,but with a common light shared between the two homes?

Yes, you can simply pound two ground rods and bond the water pipe in the garage main panel, even though the electric and water services are separate.The NEC requires bonding of the water pipe to the electrical system at each service entrance. This is to ensure that there is a continuous path to ground for any fault current that may occur on the electrical system. If the water pipe is not bonded, then fault current could travel through the water pipe to another building or structure, which could pose a safety hazard.In your case, the two buildings are connected by a shared water line. This means that there is already a conductive path between the two buildings. By bonding the water pipe in the garage, you are ensuring that there is a low-resistance path to ground for any fault current that may occur on the garage's electrical system.As for the 3-way light switch, this is not a concern. The 3-way switch is simply a way to control a light from two different locations. The switch itself does not require a ground connection.

Here is a summary of the steps you should take:1. Pound two ground rods at the garage.
2. Bond the water pipe to the ground rods.3. Bond the electrical system to the water pipe in the garage main panel.
4. Install the 3-way light switches as desired.By following these steps, you will ensure that the electrical system in the garage is properly grounded and that the 3-way light switch is installed safely. Flag for review