User: ronkruk, Location: Iowegia
Asked on: Tuesday, March 22, 2011 at 10:55 am EDT
Answered on: Tuesday, May 14, 2024 at 3:05 am EDT
Question: Is there a code that states the length conduit can be run prior to installing a pull box? I need the code not the recommendation.
2020 National Electrical Code (NEC)* 358.24 Enclosure Length of Pull. A conduit, before entering an enclosure, shall be threaded into the enclosure for at least the length of its trade size. Flag for review