Topic: flush mount panel uni-strut issues

User: quicksilverelectric, Location: New England

Asked on: Wednesday, March 23, 2011 at 2:03 am EDT
Answered on: Tuesday, May 14, 2024 at 3:08 am EDT

Question: I am currently doind this panel change with a murray 200amp flush mount panel and Im having clearance issues with the riser pipe I cant get a piece of uni-strut behind it there isnt enough room is there any other suggestions on supporting the 2" main

Alternative Support Options



Offset Strap

Install a strap perpendicular to the riser pipe, offset by a few inches. Secure the main to the strap using a bolt and washer.


Angled Support Bracket

Fabricate a triangular support bracket out of unistrut or angle iron that wraps around the riser pipe and provides a support point for the main.

Side Mount Bracket

Mount a bracket to the side of the riser pipe that extends outward. Bolt the main to the bracket using a right-angle bracket.


Top Mount Support

If there is sufficient clearance above the panel, install a support bracket that hangs from the ceiling joists or rafters. Attach the main to the bracket using a threaded rod or bolts.

Floor Mount Support

If accessible, install a floor-mounted support bracket that provides a vertical support point for the main.

Additional Considerations



Check Local Codes

Ensure that the chosen support method complies with local electrical codes and standards.

Maintain Clearance

Keep the main securely fastened while ensuring that there is sufficient clearance to avoid contact with other conductors or the panel enclosure.


Insulate Contact Points

If the main makes contact with metal surfaces, insulate the points of contact to prevent short circuits.*

Label Support Points:
Clearly label the support points for future reference and maintenance purposes. Flag for review