Question: bidding on a cable headend site;rfq specifies a halo ground ring around the building; not very familiar w/ these as lightning protection has been sub'd out in the past.the building is 11.5'x20'; are the requirements to place one ground rod @ each corner? seems like the last time we ran conduit for our lightning sub-contractor we spaced them about 25' but that building was 600k sq ft.where do i find the requirements? customer has not been a good source for information.also they specify "inspection ports" to verify the cadwelding; is this just a handhole over each groundrod?thanks

Ground Rod Placement Requirements



Standard

NFPA 780: Standard for the Installation of Lightning Protection Systems


Section

5.3.2 Ground Ring

For buildings of this size, the following requirements apply

Ground rods must be spaced no more than 15 feet apart. Ground rods must be installed at each corner of the building and at intermediate intervals to achieve the required spacing. For your building, you would need at least 5 ground rods (one at each corner and one in the center).

Inspection Ports



Definition

An access opening provided in the concrete or other material surrounding a ground rod connection to allow for visual inspection of the connection.

Purpose

To verify that the ground rod is properly connected to the grounding conductor using cadwelding or other approved method.


Requirement

Inspection ports are typically required for all ground rod connections, including those under halo ground rings.

Handhole vs. Inspection Port

A handhole is a larger opening (typically 18" x 24") that allows access to the ground rod connection for maintenance or repairs. An inspection port is a smaller opening (typically 4" x 4") that is used solely for visual inspection.

Recommendations:
Install 5 ground rods around the building at the required spacing. Provide inspection ports over each ground rod connection to allow for visual verification of the cadwelding. Refer to NFPA 780 for detailed specifications and guidance. If possible, consult with a qualified lightning protection engineer to ensure proper design and installation. Flag for review